Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10708
Well Classification: OW Status: PR - 2/1/2011
Well Name/No:A.C. MCLAUGHLIN #92X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:D 032675
Facility Status:PRStatus Date2/1/2011
FacilityID:283470LocationID:316521
County:RIO BLANCO #103Location:NENE 15 2N103W 6
Field:RANGELY - #72370Elevation:5535 ft.
Basin:PICEANCE BASIN  
Planned Location:73FNL  123 FELLat/Long: 40.150122 / -108.933430Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.150141 / -108.933434Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2011             Measured TD: 6750 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2011
Wellbore Permit
Permit #:20060118 Expiration Date:2/24/2007
Proposed Depth/Form:6835 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY WEBR SD Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/6/2007
Spud Date:9/24/2006Spud Date Is:ACTUAL
Measured TD:6750 ft.Measured PB depth:6750 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AI/SFL; CPD/CNL; CBL/GR/CCL
Log Types:
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2039 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 0 ft., Bottom: 2039 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9.625 in., Size: 7 in., Top: 0 ft., Depth: 6545 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 0 ft., Bottom: 6545 ft., Determination Method: CALC
Casing:String Type: OPEN HOLE, Hole Size: , Size: , Top: 6544 ft., Depth: 6750 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3909 ft.4006 ft.NN
MORRISON4006 ft.4726 ft.NN
CURTIS4726 ft.4830 ft.NN
ENTRADA4830 ft.4976 ft.NN
CARMEL4976 ft.5052 ft.NN
NAVAJO5052 ft.5666 ft.NN
CHINLE5666 ft.5795 ft.NN
SHINARUMP5795 ft.5906 ft.NN
MOENKOPI5906 ft.6546 ft.NN
WEBER6546 ft.6750 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 2/1/2011                  Interval Top: 6546 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:4/21/2007
Treatment Summary:FRACTURE STIMULATE IN 8 STAGE. TOTAL 101,851# 62.26BPM @ 1485 PSI AVERAGE
Tubing Size:2.875 in.Tubing Setting Depth:6517 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/7/2007Test Method:TEST VESSEL
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2358
BBLS_OIL 10
CALC_BBLS_H2O 2358
CALC_BBLS_OIL 10
CALC_GOR 100
CALC_MCF_GAS 1
GRAVITY_OIL 34
MCF_GAS 1
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)9839
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day26.954
Average MCFE per Day156.336

 Federal Financial Assurance  i Y

 Tribal Well  i No