Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10654
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:PICEANCE CREEK UNIT #T35X-2G1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COD035705
Facility Status:SIStatus Date5/1/2025
FacilityID:281433LocationID:335694
County:RIO BLANCO #103Location:NESW 2 2S97W 6
Field:PICEANCE CREEK - #68800Elevation:6943 ft.
Basin:PICEANCE BASIN  
Planned Location:2388FSL  1901 FWLLat/Long: 39.905482 / -108.251025Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.905344 / -108.250965Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 12881 ft.    Vertical TD: 12716 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20053875 Expiration Date:11/16/2006
Proposed Top PZ Location:Sec:2 Twp: 2S 97W Footage: 1123 FSL  1837 FWL
Bottom Hole Location:Sec:2 Twp: 2S 97W Footage: 1132 FSL  1837 FWL
Proposed Depth/Form:13500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:PICEANCE CREEK Unit Number:COC 47666X
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/29/2008
Spud Date:5/22/2006Spud Date Is:ACTUAL
Measured TD:12881 ft.Measured PB depth:12758 ft.
True Vertical TD:12716 ft.True Vertical PB depth:12593 ft.
Top PZ Location:Sec:2 Twp: 2S 97WFootage: 1123 FSL  1837 FWL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:DIRECTIONAL SURVEY,MUD LOGS,PERFORM-MVC, CBL, LITHODENSITY/COMP. NEUTRON, GR-BOREHOLE COMP SONIC, CEMENT VOL. ENV. MEASURE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 59, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 4007 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1735, Top: 0 ft., Bottom: 4007 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: 0 ft., Depth: 8743 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 745, Top: 5940 ft., Bottom: 8743 ft., Determination Method: CALC
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5940 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 685, Top: 4278 ft., Bottom: 5940 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12840 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1018, Top: 6389 ft., Bottom: 12840 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G5540 ft.7400 ft.NN
OHIO CREEK7400 ft.7711 ft.NN
WILLIAMS FORK - CAMEO7711 ft.11614 ft.NN
ROLLINS11614 ft.11820 ft.NN
COZZETTE11820 ft.12086 ft.NN
CORCORAN12086 ft.12881 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 5/1/2025                  Interval Top: 12136 ft.    Interval Bottom: 12564 ft.

 Completed Information for Formation CORCORAN
1st Production Date:6/18/2008Choke Size:0.219 in.
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/16/2008
Treatment Summary:FRAC W/ 182,200# 40/70 PROPPANT. FRAC PLUG @ 12,170'.
Tubing Size:2.375 in.Tubing Setting Depth:11127 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/22/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CALC_BBLS_H2O 135
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 350
CASING_PRESS 1752
Perforation Data:
Interval Top:12136 ft.# Of Holes:64
Interval Bottom:12564 ft.Hole Size:0.32 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 8/1/2024                  Interval Top: 11912 ft.    Interval Bottom: 12080 ft.

 Completed Information for Formation COZZETTE
1st Production Date:6/18/2008Choke Size:0.219 in.
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/17/2008
Treatment Summary:FRAC W/ 122,200# 40/70 PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:11127 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/22/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CALC_BBLS_H2O 45
CALC_BBLS_OIL 0
CALC_MCF_GAS 117
CASING_PRESS 1752
Perforation Data:
Interval Top:11912 ft.# Of Holes:48
Interval Bottom:12080 ft.Hole Size:0.32 in.

Formation RLNS                     Formation Classification:  GW                     Status:  SI - 7/1/2024                  Interval Top: 11796 ft.    Interval Bottom: 11800 ft.

 Completed Information for Formation ROLLINS
1st Production Date:6/18/2008Choke Size:0.219 in.
Formation Name:ROLLINSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/17/2008
Treatment Summary:FRAC W/ 60,800# 40/70 PROPPANT
Tubing Size:2.375 in.Tubing Setting Depth:11127 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/22/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CALC_BBLS_H2O 35
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 91
CASING_PRESS 1752
Perforation Data:
Interval Top:11796 ft.# Of Holes:16
Interval Bottom:11800 ft.Hole Size:0.32 in.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 9200 ft.    Interval Bottom: 11526 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/18/2008Choke Size:0.219 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/17/2008
Treatment Summary:FRAC W/ 1,114,600# 40/70 PROPPANT. FRAC PLUGS @ 11,508, 11,250, 11,010, 10,460, 10,150, 10,047, & 9,630.
Tubing Size:2.375 in.Tubing Setting Depth:11127 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/22/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CALC_BBLS_H2O 664
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1718
CASING_PRESS 1752
Perforation Data:
Interval Top:9200 ft.# Of Holes:480
Interval Bottom:11526 ft.Hole Size:0.32 in.

Formation OHCRK                   Formation Classification:  GW                   Status:  SI - 8/1/2024                  Interval Top: 7410 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation OHIO CREEK
1st Production Date:6/18/2008Choke Size:0.219 in.
Formation Name:OHIO CREEKCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/2008
Treatment Summary:FRAC W/ 75,300# 40/70 PROPPANT. DO ALL FRAC PLUGS ON 7/6/08.
Tubing Size:2.375 in.Tubing Setting Depth:11127 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/22/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1066
CALC_BBLS_H2O 53
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 137
CASING_PRESS 1752
Perforation Data:
Interval Top:7410 ft.# Of Holes:32
Interval Bottom:7418 ft.Hole Size:0.32 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)5
GOR
GOR DeterminationMCFE
Average BOE per Day0.003
Average MCFE per Day0.014

 Federal Financial Assurance  i Y

 Tribal Well  i No