Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10624
Well Classification: DSPW Status: IJ - 10/1/2025
Well Name/No:FEDERAL #299-27-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 060757
Facility Status:IJStatus Date10/1/2025
FacilityID:279503LocationID:316485
County:RIO BLANCO #103Location:SWNE 27 2S99W 6
Field:SAGE BRUSH HILLS II - #76140Elevation:7173 ft.
Basin:PICEANCE BASIN  
Planned Location:1889FNL  1837 FELLat/Long: 39.849361 / -108.487631Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.849350 / -108.487740Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/25/2012
End Date: 7/24/2012
Reported: 8/23/2013
Days to report: 395
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: IJ - 10/1/2025             Measured TD: 8920 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        IJ - 10/1/2025
Wellbore Permit
Permit #:20052600 Expiration Date:8/22/2006
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/26/2005
Spud Date:11/3/2005Spud Date Is:ACTUAL
Measured TD:8920 ft.Measured PB depth:8870 ft.
True Vertical TD:True Vertical PB depth:
Log Types:BOREHOLE, VARIABLE DENSITY, CEMENT BOND, CALIPER PRINT, ARRAY INDUCTION, GAMMA RAY, DENSITY POROSITY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 755, Top: 0 ft., Bottom: 3266 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8940 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 2948 ft., Bottom: 8940 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3746 ft.NN
OHIO CREEK5138 ft.NN
WILLIAMS FORK5261 ft.NN
ROLLINS8012 ft.NN
COZZETTE8090 ft.NN

Formation SEGO                     Formation Classification:  DSPW                     Status:  AB - 12/19/2005                Interval Top: 8634 ft.    Interval Bottom: 8723 ft.

 Completed Information for Formation SEGO
1st Production Date:N/AChoke Size: 
Formation Name:SEGOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:8634 ft.# Of Holes:0
Interval Bottom:8723 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 6/1/2018                  Interval Top: 6220 ft.    Interval Bottom: 6836 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/6/2006Choke Size:0.281 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2006
Treatment Summary:STAGE 2,3,4,THROU 5; 371000 20/40 JORDAN SAND
Tubing Size:2.375 in.Tubing Setting Depth:6189 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/4/2006Test Method:FLOW TO PIT
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 280
CALC_BBLS_H2O 280
CALC_MCF_GAS 186
CASING_PRESS 1400
MCF_GAS 186
TUBING_PRESS 100
Perforation Data:
Interval Top:6220 ft.# Of Holes:150
Interval Bottom:6836 ft.Hole Size:

Formation WFCM                     Formation Classification:  DSPW                     Status:  IJ - 10/1/2025                 Interval Top: 5167 ft.    Interval Bottom: 7539 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/3/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/18/2012Treatment End Date:7/30/2012
Treatment Summary:26740 bbls of slickwater; 1019000 20/40; 1360 gals of biocide; 4970 gals of acid
Total fluid used in treatment (bbls):26890Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):118Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):26740Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):32Disposition method For flowback:RECYCLE
Total proppant used (lbs):1019000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:5167 ft.# Of Holes:366
Interval Bottom:7539 ft.Hole Size:0.35 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
10/13/2025
Defined Inactive (UIC)YDefined Inactive
10/31/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No