Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10624
Well Classification: DSPW Status: IJ - 10/1/2025
Well Name/No:FEDERAL #299-27-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 060757
Facility Status:IJStatus Date10/1/2025
FacilityID:279503LocationID:316485
County:RIO BLANCO #103Location:SWNE 27 2S99W 6
Field:SAGE BRUSH HILLS II - #76140Elevation:7173 ft.
Basin:PICEANCE BASIN  
Planned Location:1889FNL  1837 FELLat/Long: 39.849361 / -108.487631Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.849350 / -108.487740Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/25/2012
End Date: 7/24/2012
Reported: 8/23/2013
Days to report: 395
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: IJ - 10/1/2025             Measured TD: 8920 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        IJ - 10/1/2025
Wellbore Permit
Permit #:20052600 Expiration Date:8/22/2006
Proposed Depth/Form:9000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/26/2005
Spud Date:11/3/2005Spud Date Is:ACTUAL
Measured TD:8920 ft.Measured PB depth:8870 ft.
True Vertical TD:True Vertical PB depth:
Log Types:BOREHOLE, VARIABLE DENSITY, CEMENT BOND, CALIPER PRINT, ARRAY INDUCTION, GAMMA RAY, DENSITY POROSITY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 755, Top: 0 ft., Bottom: 3266 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8940 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 2948 ft., Bottom: 8940 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3746 ft.NN
OHIO CREEK5138 ft.NN
WILLIAMS FORK5261 ft.NN
ROLLINS8012 ft.NN
COZZETTE8090 ft.NN

Formation SEGO                     Formation Classification:  DSPW                     Status:  AB - 12/19/2005                Interval Top: 8634 ft.    Interval Bottom: 8723 ft.

 Completed Information for Formation SEGO
1st Production Date:N/AChoke Size: 
Formation Name:SEGOCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:8634 ft.# Of Holes:0
Interval Bottom:8723 ft.Hole Size:

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 6/1/2018                  Interval Top: 6220 ft.    Interval Bottom: 6836 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:3/6/2006Choke Size:0.281 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/8/2006
Treatment Summary:STAGE 2,3,4,THROU 5; 371000 20/40 JORDAN SAND
Tubing Size:2.375 in.Tubing Setting Depth:6189 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/4/2006Test Method:FLOW TO PIT
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 280
CALC_BBLS_H2O 280
CALC_MCF_GAS 186
CASING_PRESS 1400
MCF_GAS 186
TUBING_PRESS 100
Perforation Data:
Interval Top:6220 ft.# Of Holes:150
Interval Bottom:6836 ft.Hole Size:

Formation WFCM                     Formation Classification:  DSPW                     Status:  IJ - 10/1/2025                 Interval Top: 5167 ft.    Interval Bottom: 7539 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/3/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/18/2012Treatment End Date:7/30/2012
Treatment Summary:26740 bbls of slickwater; 1019000 20/40; 1360 gals of biocide; 4970 gals of acid
Total fluid used in treatment (bbls):26890Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):118Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):26740Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):32Disposition method For flowback:RECYCLE
Total proppant used (lbs):1019000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:5167 ft.# Of Holes:366
Interval Bottom:7539 ft.Hole Size:0.35 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
10/13/2025
Defined Inactive (UIC)YLast Use
10/31/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No