|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/3/2018 Measured TD: 9823 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/3/2018 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 9/20/2007 | | Proposed Depth/Form: | 9800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CRCRN , Formation: CORCORAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LOYD , Formation: LOYD SS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 2961 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 635, Top: 0 ft., Bottom: 2961 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 9821 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1240, Top: 5600 ft., Bottom: 9821 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/24/2006 | | Spud Date: | 2/25/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 9823 ft. | Measured PB depth: | 9775 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | PLATFORM EXPRESS, NEUTRON DENSITY POROSITY, CEMENT VOLUMES, CEMENT BOND, ULTRASONIC IMAGING-CEMENT&CORROSION, UNTRASONIC IMAGING-CORRELATION | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2961 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 635, Top: 0 ft., Bottom: 2961 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 5600 ft., Depth: 9821 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1240, Top: 2700 ft., Bottom: 9821 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 3140 ft. | | N | N | | OHIO CREEK | 5766 ft. | | N | N | | WILLIAMS FORK | 5932 ft. | | N | N | | CAMEO | 8175 ft. | | N | N | | ROLLINS | 8664 ft. | | N | N | | COZZETTE | 8767 ft. | | N | N | | CORCORAN | 9088 ft. | | N | N | | SEGO | 9303 ft. | | N | N |
Formation SEGO Formation Classification: OG Status: PR - 5/3/2018 Interval Top: 9310 ft. Interval Bottom: 9572 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 12/2/2006 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/9/2006 | | Treatment Summary: | 3752 bbls of slickwater; 132083 30/50 Sand | | Formation Treatment | | Treatment Date: | 5/8/2006 | | Treatment Summary: | ACID FRAC. UPPER: 23K GALS SLICKWATER PAD & 74K GALS SLICKWATER CARRYING 85K LBS 30/50 WHITE SAND - FLUSHED WELL W/5,586 GALS SLICKWATER. LOWER: 18K GALS SLICKWATER PAD & 65K GALS SLICKWATER CARRYING 76K# 30/50 WHITE SAND; FLUSHED W/6,216 GALS SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 9310 ft. | # Of Holes: | 51 | | Interval Bottom: | 9572 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OG Status: SI - 10/1/2025 Interval Top: 9292 ft. Interval Bottom: 9294 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 12/2/2006 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/9/2006 | | Treatment Summary: | 814 bbls of slickwater; 28166 30/50 Sand | | Formation Treatment | | Treatment Date: | 5/8/2006 | | Treatment Summary: | ACID FRAC. 23K GALS SLICKWATER PAD & 65K GALS SLICKWATER CARRYING 78K LBS 30/50 WHITE SAND; FLUSHED W/5,796 GALS SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 9292 ft. | # Of Holes: | 6 | | Interval Bottom: | 9294 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OG Status: PR - 7/31/2018 Interval Top: 8894 ft. Interval Bottom: 9056 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 12/1/2006 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/9/2006 | | Treatment Summary: | 2233 bbls of slickwater; 76000 30/50 Sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 8894 ft. | # Of Holes: | 33 | | Interval Bottom: | 9056 ft. | Hole Size: | 0.35 in. |
|
Formation CCCSG Formation Classification: OG Status: CM - 7/31/2018 Interval Top: 8334 ft. Interval Bottom: 9572 ft.| Completed Information for Formation CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 12/4/2006 | Choke Size: | | | Formation Name: | CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/9/2006 | | Treatment Summary: | 11079 bbls of slickwater; 379000 30/50 Sand |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6585 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | FLOWING | | Hours Tested: | 0 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1164 | | CALC_MCF_GAS | 1150 | | CASING_PRESS | 1650 | | MCF_GAS | 1150 | | TUBING_PRESS | 1225 |
| | Perforation Data: | | Interval Top: | 8334 ft. | # Of Holes: | 159 | | Interval Bottom: | 9572 ft. | Hole Size: | 0.35 in. |
|
Formation CMEO Formation Classification: OG Status: PR - 5/3/2018 Interval Top: 8334 ft. Interval Bottom: 8616 ft.| Completed Information for Formation CAMEO | | 1st Production Date: | 12/2/2006 | Choke Size: | | | Formation Name: | CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/9/2006 | | Treatment Summary: | 4279 bbls of slickwater; 142750 30/50 Sand | | Formation Treatment | | Treatment Date: | 5/8/2006 | | Treatment Summary: | STAGE 4: 20 K GALS SLICKWATER PAD & 48,750 GALS SW CARRYING 52K LBS 30/50 WHITE SAND-FLUSHED WELL W/ 5586 GALS SLICKWATER STAGE 5: 22K GALS SLICKWATER PAD & 78K GALS SW CARRYING 91K LBS 30/50 WHITE SAND-FLUSHED WELL W/5376 GALS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEO. |
| | Perforation Data: | | Interval Top: | 8334 ft. | # Of Holes: | 69 | | Interval Bottom: | 8616 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 23 |
| Total Gas Produced (MCF) | 11721 |
| GOR | 509608 |
| GOR Determination | MCFE |
| Average BOE per Day | 5.597 |
| Average MCFE per Day | 32.482 |
| Federal Financial Assurance | i | Y |
|
|