Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10612
Well Classification: OW Status: PR - 12/1/2021
Well Name/No:M.C.HAGOOD A #16X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2021
FacilityID:278956LocationID:316481
County:RIO BLANCO #103Location:NWNE 15 2N103W 6
Field:RANGELY - #72370Elevation:5574 ft.
Planned Location:1172FNL  2557 FELLat/Long: 40.146984 / -108.942138Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.147120 / -108.942140Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2021             Measured TD: 6900 ft.    Vertical TD: 6894 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2021
Wellbore Permit
Permit #:20052187 Expiration Date:7/24/2006
Prop Depth/Form:6645 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY WEBR SD Unit Number:COC 47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: , Weight: 23 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom:

Wellbore Completed
Completion Date:1/26/2006
Spud Date:10/23/2005Spud Date Is:ACTUAL
Measured TD:6900 ft.Measured PB depth:6802 ft.
True Vertical TD:6894 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1062 FNL  2473 FWLDepth
Log Types:RST SIGMA/ CO LOG & CEMENT BOND LOG
Casing:String Type: CONDUCTOR, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1039 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 573, Top: 0 ft., Bottom: 1039 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6884 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 775, Top: 0 ft., Bottom: 6883 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3920 ft.NN
MORRISON4014 ft.NN
CURTIS4716 ft.NN
ENTRADA4818 ft.NN
CARMEL4964 ft.NN
NAVAJO5026 ft.NN
CHINLE5646 ft.NN
SHINARUMP5764 ft.NN
MOENKOPI5850 ft.NN
WEBER6527 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 12/1/2021                 Interval Top: 6538 ft.    Interval Bottom: 6740 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/26/2006
Treatment Summary:PUMP 5,124 GALS SCALE INHIBITOR MIXTURE @ 8 BPM 1090 PSI. FRAC IN 8 STAGES W/TTL 23,5000 GALS YF130 & 100,000# SUPER LC RESIN COATED SAND @ AVERAGE 57 BPM 1210 PSI.
Tubing Size:2.875 in.Tubing Setting Depth:6398 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/27/2006Test Method:TEST VESSEL
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2200
BBLS_OIL 500
CALC_BBLS_H2O 2200
CALC_BBLS_OIL 500
CALC_GOR 2200
CALC_MCF_GAS 1100
GRAVITY_OIL 34
MCF_GAS 1100
Perforation Data:
Interval Top:6538 ft.# Of Holes:606
Interval Bottom:6740 ft.Hole Size:4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)6825
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day18.648
Average MCFE per Day108.154

 Federal Financial Assurance  i Y

 Tribal Well  i No