|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 11/1/2025 Measured TD: 12769 ft. Vertical TD: 12694 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 11/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20051644 | Expiration Date: | 6/6/2006 | | Proposed Top PZ Location: | Sec:11 Twp: 2S 97W | Footage: 1388 FNL 2145 FEL | | Bottom Hole Location: | Sec:11 Twp: 2S 97W | Footage: 1388 FNL 2145 FEL | | Proposed Depth/Form: | 13500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | PICEANCE CREEK | Unit Number: | COC 47666X | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/15/2005 | | Spud Date: | 9/12/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 12769 ft. | Measured PB depth: | 12673 ft. | | True Vertical TD: | 12694 ft. | True Vertical PB depth: | 12598 ft. | | Top PZ Location: | Sec:11 Twp: 2S 97W | Footage: 1451 FNL 2127 FEL | | Bottom Hole Location: | Sec:11 Twp: 2S 97W | Footage: 1451 FNL 2127 FEL | | Log Types: | CBL, GR, CCL | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 170 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 96, Top: 0 ft., Bottom: 170 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 1383 ft., Depth: 3269 ft., Weight: 45.5 , Citings Type: ACTUAL | | Cement: | Sacks: 2030, Top: 1383 ft., Bottom: 3269 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: 5068 ft., Depth: 8220 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 1391, Top: 3496 ft., Bottom: 8220 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12769 ft., Weight: 15.1 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 6970 ft., Bottom: 12769 ft., Determination Method: CBL | | Casing: | String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5458 ft. | 7344 ft. | N | N | | OHIO CREEK | 7344 ft. | 7538 ft. | N | N | | WILLIAMS FORK - CAMEO | 7538 ft. | 11525 ft. | N | N | | ROLLINS | 11525 ft. | 11710 ft. | N | N | | COZZETTE | 11710 ft. | 12031 ft. | N | N | | CORCORAN | 12031 ft. | | N | N |
Formation CRCRN Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 12076 ft. Interval Bottom: 12589 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 4/26/2006 | Choke Size: | 0.375 in. | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/25/2006 | | Treatment Summary: | FRAC'D W/200,075# 40/70 API PROPPANT. SET FRAC PLUG @ 12,100'. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11442 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/12/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 110 | | CALC_MCF_GAS | 735 | | CASING_PRESS | 2242 |
| | Perforation Data: | | Interval Top: | 12076 ft. | # Of Holes: | 84 | | Interval Bottom: | 12589 ft. | Hole Size: | 0.32 in. |
|
Formation COZZ Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 11721 ft. Interval Bottom: 11978 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 5/12/2006 | Choke Size: | 0.375 in. | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/25/2006 | | Treatment Summary: | FRAC'D W/140,451# 40/70 API PROPPANT. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11442 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/12/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 48 | | CALC_MCF_GAS | 320 | | CASING_PRESS | 2242 |
| | Perforation Data: | | Interval Top: | 11721 ft. | # Of Holes: | 48 | | Interval Bottom: | 11978 ft. | Hole Size: | 0.32 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 7565 ft. Interval Bottom: 11507 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 5/12/2006 | Choke Size: | 0.375 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/5/2006 | | Treatment Summary: | SEE SCANNED DOC# 1510468 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11442 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/12/2006 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 593 | | CALC_MCF_GAS | 3971 | | CASING_PRESS | 2242 |
| | Perforation Data: | | Interval Top: | 7565 ft. | # Of Holes: | 528 | | Interval Bottom: | 11507 ft. | Hole Size: | 0.32 in. |
|
Formation OHCRK Formation Classification: GW Status: SI - 11/1/2025 Interval Top: 7360 ft. Interval Bottom: 7498 ft.| Completed Information for Formation OHIO CREEK | | 1st Production Date: | 5/12/2006 | Choke Size: | 0.375 in. | | Formation Name: | OHIO CREEK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/5/2006 | | Treatment Summary: | FRAC'D W/147,807# 30/70 BRADY PROPPANT. SET FRAC PLUG @ 7520', DO ALL FRAC PLUGS |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11442 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/12/2006 | Test Method: | FLOWIN | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 29 | | CALC_MCF_GAS | 193 | | CASING_PRESS | 2242 |
| | Perforation Data: | | Interval Top: | 7360 ft. | # Of Holes: | 36 | | Interval Bottom: | 7498 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 479 |
| Total Gas Produced (MCF) | 3152 |
| GOR | 6580 |
| GOR Determination | BOE |
| Average BOE per Day | 2.801 |
| Average MCFE per Day | 16.239 |
| Federal Financial Assurance | i | Y |
|
|