Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10581
Well Classification: GW Status: SI - 8/1/2025
Well Name/No:WEAVER RIDGE #23-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:ROBERT L BAYLESS PRODUCER LLC - 6720
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 058705
Facility Status:SIStatus Date8/1/2025
FacilityID:277805LocationID:316466
County:RIO BLANCO #103Location:SWSE 23 1S104W 6
Field:GILSONITE DRAW - #30100Elevation:6543 ft.
Basin:PICEANCE BASIN  
Planned Location:364FSL  1930 FELLat/Long: 39.940347 / -109.033379Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.940323 / -109.033407Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2025             Measured TD: 5017 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20051444 Expiration Date:5/22/2006
Proposed Top PZ Location:Sec:23 Twp: 1S 104W Footage: 659 FSL  1983 FEL
Bottom Hole Location:Sec:23 Twp: 1S 104W Footage: 659 FSL  1983 FEL
Proposed Depth/Form:4960 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: MNCSB , Formation: MANCOS B , Order: , Unit Acreage: , Drill Unit: UNSPAC

Wellbore Completed
Completion Date:9/22/2005
Spud Date:8/10/2005Spud Date Is:ACTUAL
Measured TD:5017 ft.Measured PB depth:4954 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:23 Twp: 1S 104WFootage: 659 FSL  1983 FEL
Bottom Hole Location:Sec:23 Twp: 1S 104WFootage: 659 FSL  1983 FEL
Log Types:SP, GAMMA RAY,DUAL INDUCTION,DENSITY,NEUTRON,SONIC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 411 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 411 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 5008 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1030, Top: 0 ft., Bottom: 5008 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER0 ft.1489 ft.NN
WASATCH1489 ft.1902 ft.NN
MESAVERDE1902 ft.2993 ft.NN
SEGO2993 ft.3274 ft.NN
CASTLEGATE3504 ft.3645 ft.NN
MANCOS3645 ft.4668 ft.NN
MANCOS B4668 ft.4844 ft.NN

Formation MNCSB                   Formation Classification:  GW                   Status:  SI - 8/1/2025                  Interval Top: 4674 ft.    Interval Bottom: 4823 ft.

 Completed Information for Formation MANCOS B
1st Production Date:N/AChoke Size:0.375 in.
Formation Name:MANCOS BCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/22/2005
Treatment Summary:ACIDIZED W/1,000 GAL 7 1/2% AND 15% HC1 ACID - FRACTURE TREAT W/65,000 GAL SILVERSTIM LT CROSS-LINKED GEL CONTAINING 150,000 LBS 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:4789 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/22/2005Test Method:FLOWING
Hours Tested:3Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_OIL 0
CASING_PRESS 750
Perforation Data:
Interval Top:4674 ft.# Of Holes:22
Interval Bottom:4823 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)658
Total Gas Produced (MCF)5921
GOR8998
GOR DeterminationBOE
Average BOE per Day4.616
Average MCFE per Day26.750

 Federal Financial Assurance  i Y

 Tribal Well  i No