Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10560
Well Classification: GW Status: PR - 10/21/2025
Well Name/No:PICEANCE CREEK UNIT #T25X-25G
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COD 035710
Facility Status:PRStatus Date10/21/2025
FacilityID:277179LocationID:335826
County:RIO BLANCO #103Location:NWSW 25 1S97W 6
Field:PICEANCE CREEK - #68800Elevation:6878 ft.
Basin:PICEANCE BASIN  
Planned Location:2018FSL  893 FWLLat/Long: 39.933801 / -108.235245Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.933640 / -108.235390Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/21/2025             Measured TD: 9135 ft.    Vertical TD: 9124 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/21/2025
Wellbore Permit
Permit #:20050895 Expiration Date:4/14/2006
Proposed Depth/Form:15500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:PICEANCE CREEK Unit Number:COC047666X
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 7 in., Top: , Depth: 10500 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 955, Top: 3400 ft., Bottom: 10500 ft.

Wellbore Completed
Completion Date:7/6/2005
Spud Date:5/29/2005Spud Date Is:ACTUAL
Measured TD:9135 ft.Measured PB depth:8998 ft.
True Vertical TD:9124 ft.True Vertical PB depth:8988 ft.
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:GR, AIT, RES., DEV, NEU-TRIPLE COMBO, CBL/GR/CCL/DIS/GPIT
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 128 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 208, Top: 0 ft., Bottom: 128 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3588 ft., Weight: 47 , Citings Type: ACTUAL
Cement:Sacks: 1290, Top: 1300 ft., Bottom: 3588 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 4.5 in., Top: 0 ft., Depth: 9120 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 7730 ft., Bottom: 9120 ft., Determination Method:
Casing:String Type: 2ND, Hole Size: 8.5 in., Size: 4.5 in., Top: 0 ft., Depth: 9131 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 505, Top: 5500 ft., Bottom: 9135 ft., Determination Method: CALC
Casing:String Type: STAGE TOOL, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1300 ft., Weight: 47 , Citings Type: ACTUAL
Cement:Sacks: 602, Top: 0 ft., Bottom: 1300 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH G6025 ft.7906 ft.NN
OHIO CREEK7906 ft.8113 ft.NN
WILLIAMS FORK8113 ft.9135 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/21/2025                Interval Top: 8170 ft.    Interval Bottom: 8472 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:7/18/2005Choke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/6/2005
Treatment Summary:SEE ABOVE
Tubing Size:2.375 in.Tubing Setting Depth:7929 ft.
Tubing Packer Depth:7895 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 824
BBLS_OIL 0
CALC_BBLS_H2O 824
CALC_BBLS_OIL 0
CALC_MCF_GAS 1256
CASING_PRESS 681
MCF_GAS 1256
Perforation Data:
Interval Top:8170 ft.# Of Holes:80
Interval Bottom:8472 ft.Hole Size:2 in.

Formation OHCRK                   Formation Classification:  GW                   Status:  PR - 10/21/2025                Interval Top: 7920 ft.    Interval Bottom: 8095 ft.

 Completed Information for Formation OHIO CREEK
1st Production Date:7/18/2005Choke Size: 
Formation Name:OHIO CREEKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:7/6/2005
Treatment Summary:TOTAL PROPPANT FRAC'D FOR ALL PERFS WAS 600,000 #S OF 30/70 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7929 ft.
Tubing Packer Depth:7895 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 167
BBLS_OIL 0
CALC_BBLS_H2O 167
CALC_BBLS_OIL 0
CALC_MCF_GAS 254
CASING_PRESS 681
MCF_GAS 254
Perforation Data:
Interval Top:7920 ft.# Of Holes:48
Interval Bottom:8095 ft.Hole Size:2 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)292
Total Gas Produced (MCF)10381
GOR35551
GOR DeterminationMCFE
Average BOE per Day5.688
Average MCFE per Day32.991

 Federal Financial Assurance  i Y

 Tribal Well  i No