Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10488
Well Classification: DSPW Status: IJ - 8/1/2025
Well Name/No:FEDERAL #299-23-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC60755
Facility Status:IJStatus Date8/1/2025
FacilityID:273733LocationID:316420
County:RIO BLANCO #103Location:SESW 23 2S99W 6
Field:SAGE BRUSH HILLS II - #76140Elevation:7068 ft.
Basin:PICEANCE BASIN  
Planned Location:955FSL  1949 FWLLat/Long: 39.857219 / -108.474242Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.857220 / -108.474220Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/20/2014
End Date: 11/21/2014
Reported: 1/20/2015
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 8/1/2025             Measured TD: 8807 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 8/1/2025
Wellbore Permit
Permit #: Expiration Date:7/27/2016
Proposed Depth/Form:6300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: FTUN , Formation: FORT UNION , Order: 527-6 , Unit Acreage: 10, Drill Unit: S/2
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 527-6 , Unit Acreage: 10, Drill Unit: S/2
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3382 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 425, Top: 0 ft., Bottom: 3382 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8805 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 826, Top: 3125 ft., Bottom: 8805 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:3/1/2005Spud Date Is:ACTUAL
Measured TD:8807 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:GR, SCMT, RST, CASED HOLE GYROSCOPE
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3382 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 1522 ft., Bottom: 3382 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8805 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 826, Top: 6025 ft., Bottom: 8805 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 3120 ft., Depth: 6025 ft., Bottom: 6025 ft., Sacks: 785, Method: STAGE TOOL
Additional Cement:String Type: STAGE TOOL, Top: 3200 ft., Depth: 6025 ft., Bottom: 6025 ft., Sacks: , Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 1522 ft., Bottom: 1522 ft., Sacks: 290, Method: STAGE TOOL
FormationInterval TopLog BottomCoredDSTs
WASATCH2370 ft.
WASATCH G3711 ft.
FORT UNION3900 ft.
WILLIAMS FORK5274 ft.
MESAVERDE6911 ft.
CAMEO7534 ft.
ROLLINS7879 ft.
COZZETTE7938 ft.
CORCORAN8175 ft.
SEGO8512 ft.

Formation SEGO                     Formation Classification:  DSPW                     Status:  AB - 11/12/2005                Interval Top: 8572 ft.    Interval Bottom: 8630 ft.

 Completed Information for Formation SEGO
1st Production Date:N/AChoke Size: 
Formation Name:SEGOCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/27/2005
Treatment Summary:14,000 GALS SW PAD, 69,500 GALS SW + 63,300# 20/40 SD
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:8572 ft.# Of Holes:18
Interval Bottom:8630 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  DSPW                     Status:  AB - 11/12/2005                Interval Top: 8047 ft.    Interval Bottom: 8057 ft.

 Completed Information for Formation COZZETTE
1st Production Date:N/AChoke Size: 
Formation Name:COZZETTECommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/27/2005
Treatment Summary:17,000 GALS SW PAD, 53,666 GALS SW + 43,000# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:8047 ft.# Of Holes:14
Interval Bottom:8057 ft.Hole Size:4 in.

Formation RLNS                     Formation Classification:  DSPW                     Status:  AB - 11/12/2005                Interval Top: 7873 ft.    Interval Bottom: 7944 ft.

 Completed Information for Formation ROLLINS
1st Production Date:N/AChoke Size: 
Formation Name:ROLLINSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/27/2005
Treatment Summary:25,000 GALS SW PAD, 71,400 GALS SW + 51,000# 20/40 JORDAN SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RLNS.
Perforation Data:
Interval Top:7873 ft.# Of Holes:78
Interval Bottom:7944 ft.Hole Size:4 in.

Formation MVRD                     Formation Classification:  DSPW                     Status:  AB - 12/12/2014                Interval Top: 6534 ft.    Interval Bottom: 7740 ft.

 Completed Information for Formation MESAVERDE
1st Production Date:11/14/2005Choke Size: 
Formation Name:MESAVERDECommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/27/2005
Treatment Summary:68,000 GALS SW PAD, 206,363 GALS SW + 206,000# 20/40 JORDAN SAND. AND TOP; 6354 BOTTOM; 6807, HOLES; 126, 95,00 GALS SW PAD, 272,087 GLAS SW + 168,500# 20/40 JORDAN SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 96
BTU_GAS 1097
CASING_PRESS 650
MCF_GAS 1013
TUBING_PRESS 100
Perforation Data:
Interval Top:6534 ft.# Of Holes:102
Interval Bottom:7740 ft.Hole Size:0.35 in.

Formation WMFK                     Formation Classification:  DSPW                     Status:  CM - 2/11/2015                 Interval Top: 5280 ft.    Interval Bottom: 5971 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:5280 ft.# Of Holes:78
Interval Bottom:5971 ft.Hole Size:0.35 in.

Formation FTUN                     Formation Classification:  DSPW                     Status:  IJ - 8/1/2025                  Interval Top: 4974 ft.    Interval Bottom: 5191 ft.

 Completed Information for Formation FORT UNION
1st Production Date:4/11/2006Choke Size: 
Formation Name:FORT UNIONCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:3/7/2006
Treatment Summary:30K GAL SW PAD-102,600 GALS SW CARRYING 121,000#'S 20/40 JORDAN SAND, FLUSHED WELL WITH 2,940 GALS SW.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 200
BTU_GAS 952
CALC_BBLS_H2O 200
CALC_MCF_GAS 15
CASING_PRESS 220
GRAVITY_OIL 67
MCF_GAS 15
TUBING_PRESS 100
Perforation Data:
Interval Top:4974 ft.# Of Holes:24
Interval Bottom:5191 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No