Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10487
Well Classification: GW Status: PR - 3/1/2021
Well Name/No:BANTA RIDGE FED #3-17-1-103
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:LOCIN OIL CORPORATION - 51130
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 127178
Facility Status:PRStatus Date3/1/2021
FacilityID:273727LocationID:316419
County:RIO BLANCO #103Location:SESW 17 1S103W 6
Field:BANTA RIDGE - #5200Elevation:5654 ft.
Planned Location:880FSL  2430 FWLLat/Long: 39.956327 / -108.980768Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.956350 / -108.980760Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2021             Measured TD: 4250 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20042233 Expiration Date:9/16/2005
Prop Depth/Form:4181 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: MNCSB , Formation: MANCOS B , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/8/2004
Spud Date:9/26/2004Spud Date Is:ACTUAL
Measured TD:4250 ft.Measured PB depth:4172 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 660 FSL  2000 FWL
Bottom Hole Location:Sec: Twp: Footage: 660 FSL  2000 FWL
Log Types:CBL/AIT/GR/SP/LDT-CNL/CBL
Casing:String Type: CONDUCTOR, Hole Size: 12.25 in., Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 7.875 in., Size: 8.625 in., Top: 13 ft., Depth: 320 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 320 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 4225 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 320 ft., Bottom: 4235 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
MESAVERDE11 ft.2204 ft.NN
SEGO2204 ft.2350 ft.NN
CASTLEGATE2746 ft.2880 ft.NN
MANCOS2880 ft.3910 ft.NN
MANCOS B3910 ft.4095 ft.NN

Formation MNCSB                   Formation Classification:  GW                   Status:  PR - 3/1/2021                  Interval Top: 3944 ft.    Interval Bottom: 4070 ft.

 Completed Information for Formation MANCOS B
1st Production Date:10/6/2005Choke Size: 
Formation Name:MANCOS BCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/8/2004
Treatment Summary:SEE SCANNED DOC # 01492220 FOR DETAILS
Tubing Size:2.375 in.Tubing Setting Depth:3912 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/4/2005Test Method:
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 2
CALC_BBLS_H2O 12
CALC_BBLS_OIL 2
CALC_GOR 324
CALC_MCF_GAS 643
CASING_PRESS 640
MCF_GAS 628
TUBING_PRESS 340
Perforation Data:
Interval Top:3944 ft.# Of Holes:90
Interval Bottom:4070 ft.Hole Size:0.43 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
11/2023 - 10/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)75
Total Gas Produced (MCF)2778
GOR37040
GOR DeterminationMCFE
Average BOE per Day1.516
Average MCFE per Day8.811

 Federal Financial Assurance  i 

 Tribal Well  i No