|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 1/1/2026 Measured TD: 10465 ft. Vertical TD: 10371 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 1/1/2026 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20041979 | Expiration Date: | 9/13/2005 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 330 FSL 990 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 330 FSL 990 FWL | | Proposed Depth/Form: | 10150 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | FIGURE FOUR UNI | Unit Number: | COC 66492X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 4/29/2005 | | Spud Date: | 3/28/2005 | Spud Date Is: | ACTUAL | | Measured TD: | 10465 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 10371 ft. | True Vertical PB depth: | 0 ft. | | Top PZ Location: | Sec: Twp: | Footage: 330 FSL 990 FWL | | Bottom Hole Location: | Sec: Twp: | Footage: 330 FSL 990 FWL | | Log Types: | CBL, RST | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2953 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1754, Top: 0 ft., Bottom: 2956 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10460 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1497, Top: 6000 ft., Bottom: 10465 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | 3646 ft. | N | N | | WASATCH | 3647 ft. | 5509 ft. | N | N | | WILLIAMS FORK | 5510 ft. | 8928 ft. | N | N | | ROLLINS | 8929 ft. | 9072 ft. | N | N | | COZZETTE | 9073 ft. | 9292 ft. | N | N | | CORCORAN | 9293 ft. | 9497 ft. | N | N | | SEGO | 9498 ft. | 10465 ft. | N | N |
Formation SEGO Formation Classification: GW Status: SI - 1/1/2026 Interval Top: 9554 ft. Interval Bottom: 9861 ft.| Completed Information for Formation SEGO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2005 | | Treatment Summary: | STAGES 1-2 TREATED WITH A TOTAL OF: 5636 BBLS OF SLICKWATER, 200,085 LBS 20-40 SAND, 12 BBLS 7.5% HCL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/31/2005 | Test Method: | | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| MCF_GAS | 42 |
| | Perforation Data: | | Interval Top: | 9554 ft. | # Of Holes: | 42 | | Interval Bottom: | 9861 ft. | Hole Size: | |
|
Formation WMFK Formation Classification: GW Status: SI - 1/1/2026 Interval Top: 6152 ft. Interval Bottom: 8847 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | 0.375 in. | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/29/2005 | | Treatment Summary: | STAGES 3-9 TREATED WITH A TOTAL OF: 29,096 BBLS OF SLICKWATER, 899,920 LBS 20-40 SAND, 42 BBL 7.5% HCL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6061 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/30/2005 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 104 | | BBLS_OIL | 0 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 104 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 1109 | | CASING_PRESS | 842 | | MCF_GAS | 1109 | | TUBING_PRESS | 436 |
| | Perforation Data: | | Interval Top: | 6152 ft. | # Of Holes: | 168 | | Interval Bottom: | 8847 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 6 |
| Total Gas Produced (MCF) | 7308 |
| GOR | 1218000 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.464 |
| Average MCFE per Day | 20.109 |
| Federal Financial Assurance | i | Y |
|
|