|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2025 Measured TD: 9990 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2025 | | Wellbore Permit | | | Permit #: | 20075726 | Expiration Date: | 10/9/2008 | | Proposed Depth/Form: | 9990 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CMSMV , Formation: CAMEO SANDS-MESAVERDE , Order: , Unit Acreage: 160, Drill Unit: | | Formation And Spacing: | Code: FTUN , Formation: FORT UNION , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 45 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 45 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: , Depth: 2078 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 2078 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 9977 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1160, Top: 5420 ft., Bottom: 9977 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/31/2004 | | Spud Date: | 9/19/2004 | Spud Date Is: | ACTUAL | | Measured TD: | 9990 ft. | Measured PB depth: | 9951 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | HIGH RESOLUTION IND SPECTRAL DEN DUALA SPACED NEU,BOREHOLE COMP.SONIC,CBL | | Log Types: | HIGH RESOLUTION INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON, BOREHOLE COMPENSATED SONIC, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2625 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1690, Top: 0 ft., Bottom: 2625 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.043 in., Top: 0 ft., Depth: 9977 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1250, Top: 5200 ft., Bottom: 997 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 6500 ft., Depth: , Bottom: 9977 ft., Sacks: 50, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4220 ft., Depth: , Bottom: 9977 ft., Sacks: 120, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 3946 ft. | | N | N | | FORT UNION | 4135 ft. | | | | | MESAVERDE | 5592 ft. | | | | | CAMEO | 8286 ft. | | | | | ROLLINS | 8746 ft. | | | | | COZZETTE | 8850 ft. | | | | | CORCORAN | 8934 ft. | | | | | SEGO | 9646 ft. | | | |
Formation SEGO Formation Classification: GW Status: AB - 11/17/2007 Interval Top: 9409 ft. Interval Bottom: 9449 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 3/25/2005 | Choke Size: | | | Formation Name: | SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/25/2005 | | Treatment Summary: | 750 GALS 7 1/2% HCL,34000 # 20/40,2985 BBLS 30# HYBOR GEL NON COMMERCIAL PLUG SET AT8330 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 9409 ft. | # Of Holes: | 20 | | Interval Bottom: | 9449 ft. | Hole Size: | 0.34 in. |
|
Formation CRCRN Formation Classification: GW Status: AB - 11/17/2007 Interval Top: 9236 ft. Interval Bottom: 9449 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 3/25/2005 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/18/2005 | | Treatment Summary: | 750 GALS 7 1/2% HCL, 340000# 20/40, 2985 BBLS 30# HYBOR GEL. ***PLUG DEPTHS AND SACKS OF CEMENT: COZZETTE AND CORCORAN CMT PLUG FROM 8857'-9449', 57 SX CMT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 9236 ft. | # Of Holes: | 20 | | Interval Bottom: | 9449 ft. | Hole Size: | 0.34 in. |
|
Formation COZZ Formation Classification: GW Status: AB - 11/17/2007 Interval Top: 8857 ft. Interval Bottom: 9176 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 3/25/2005 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/25/2005 | | Treatment Summary: | 1000 GASL 7 1/2% HCL,293400# 20/40, 2585 BBLS 30# HYBOR GEL NON COMMERCIAL ,PLUG SET AT 8330 | | Formation Treatment | | Treatment Date: | 1/18/2005 | | Treatment Summary: | 1000 GALS 7 1/2% HCL, 293400# 20/40, 2585 BBLS 30# HYBOR GEL (SUMMARY). ***PLUG DEPTHS AND SACKS OF CEMENT: COZZETTE AND CORCORAN CMT PLUG FROM 8857'-9449', 57 SX CMT. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 8857 ft. | # Of Holes: | 20 | | Interval Bottom: | 9176 ft. | Hole Size: | 0.34 in. |
|
Formation RLNS Formation Classification: GW Status: AB - 11/17/2007 Interval Top: 8776 ft. Interval Bottom: 8802 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 3/25/2005 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/25/2005 | | Treatment Summary: | 750 GALS 7 1/2% HCL, 48600# 20/40, 1586 BBLS SLICKWATER. NON COMMERCIAL,PLUG SET AT 8330, | | Formation Treatment | | Treatment Date: | 2/9/2005 | | Treatment Summary: | 750 GALS 7 1/2% HCL, 48600# 20/40, 1586 BBLS SLICK WATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RLNS. |
| | Perforation Data: | | Interval Top: | 8776 ft. | # Of Holes: | 16 | | Interval Bottom: | 8802 ft. | Hole Size: | 0.34 in. |
|
Formation WFCM Formation Classification: GW Status: AB - 11/17/2007 Interval Top: 5426 ft. Interval Bottom: 8284 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 3/25/2005 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/25/2005 | | Treatment Summary: | 4000 GALS 7 1/2% HCL, 375000# 20/40,9107 BBLS SICKWATER, SEGO, CORCORAN, COZZETTE & ROLLINS TESTED NON COMMERCIAL AND ARE ISOLATED BY A PLUG SET AT 8330'. | | Formation Treatment | | Treatment Date: | 2/27/2005 | | Treatment Summary: | 4000 GALS 7 1/2% HCL, 375000# 20/40, 9107 BBLS SLICK WATER (SUMMARY). *** PLUG DEPTHS AND SACKS OF CEMENT (OHIO CREEK CMT PLUG FROM 5426'-5615', 25SX CMT); (MV 5 CMT PLUG FROM 6319'-6436', 18SX CMT); (MV 4-3 CMT PLUG FROM 7203'-7698', 50SX CMT); (MV 2-1 CMT PLUG FROM 7805'-8284', 48SX CMT). |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 1000 | | CASING_PRESS | 1975 | | MCF_GAS | 1000 | | TUBING_PRESS | 1650 |
| | Perforation Data: | | Interval Top: | 5426 ft. | # Of Holes: | 104 | | Interval Bottom: | 8284 ft. | Hole Size: | 0.34 in. |
|
Formation FTUN Formation Classification: GW Status: PR - 5/1/2025 Interval Top: 4203 ft. Interval Bottom: 4207 ft.| Completed Information for Formation FORT UNION | | 1st Production Date: | 11/26/2007 | Choke Size: | | | Formation Name: | FORT UNION | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/26/2007 | | Treatment Summary: | 500 GAL 7.5% HCL ACID, 100,057 # SAND, 445 BBLS SLICKWATER, 111 TON CO2 (SUMMARY). |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4168 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/13/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BTU_GAS | 1094 | | CASING_PRESS | 846 | | MCF_GAS | 1199 | | TUBING_PRESS | 762 |
| | Perforation Data: | | Interval Top: | 4203 ft. | # Of Holes: | 16 | | Interval Bottom: | 4207 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 8 |
| Total Gas Produced (MCF) | 4647 |
| GOR | 580875 |
| GOR Determination | MCFE |
| Average BOE per Day | 2.206 |
| Average MCFE per Day | 12.787 |
| Federal Financial Assurance | i | Y |
|
|