Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10404
Well Classification: DSPW Status: SI - 7/1/2022
Well Name/No:YELLOW CREEK FEDERAL #4-16 #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC59393
Facility Status:SIStatus Date7/1/2022
FacilityID:270716LocationID:316375
County:RIO BLANCO #103Location:SWSW 4 1S98W 6
Field:YELLOW CREEK - #97955Elevation:6350 ft.
Basin:PICEANCE BASIN  
Planned Location:798FSL  689 FWLLat/Long: 39.987908 / -108.403016Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.987870 / -108.403660Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: SI - 7/1/2022             Measured TD: 11400 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        SI - 7/1/2022
Wellbore Permit
Permit #:20072443 Expiration Date:6/3/2008
Proposed Depth/Form:11000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: CT-HT , Formation: CUTLER-HONAKER TRAIL , Order: , Unit Acreage: 160, Drill Unit:
Formation And Spacing:Code: LASAL , Formation: LASAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/20/2007
Spud Date:8/9/2007Spud Date Is:ACTUAL
Measured TD:11400 ft.Measured PB depth:11307 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL; CHI TRIPLE COMBO
Log Types:RCBL, CHI TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 29 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 167, Top: 0 ft., Bottom: 80 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3442 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 865, Top: 1260 ft., Bottom: 3442 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11380 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 8940 ft., Bottom: 11380 ft., Determination Method: CBL
Additional Cement:String Type: STAGE TOOL, Top: 4000 ft., Depth: 5992 ft., Bottom: 5992 ft., Sacks: 295, Method: Pump
Additional Cement:String Type: STAGE TOOL, Top: 6892 ft., Depth: 8940 ft., Bottom: 8940 ft., Sacks: 505, Method: Pump
Additional Cement:String Type: STAGE TOOL, Top: 8 ft., Depth: 1260 ft., Bottom: 1260 ft., Sacks: 650, Method: Pump
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 8 ft., Bottom: 1260 ft., Sacks: 350, Method: Top Out
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK6088 ft.NN
ROLLINS9756 ft.NN
COZZETTE9858 ft.NN
CORCORAN10034 ft.10642 ft.NN
SEGO10642 ft.10990 ft.NN

Formation SEGO                     Formation Classification:  DSPW                     Status:  SI - 7/1/2022                  Interval Top: 10672 ft.    Interval Bottom: 10990 ft.

 Completed Information for Formation SEGO
1st Production Date:11/1/2008Choke Size: 
Formation Name:SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2009
Treatment Summary:A PORTION OF THIS ZONE WAS PREVIOUSLY TREATED ON 10-22-2008. HOLE SIZE IS ACTUALLY A COMBINATION OF 0.34" AND 0.41" SIZES. PLEASE SEE DOC #S 01697152 AND 01706532 FOR ADDITIONAL DETAILS.
Tubing Size:2.375 in.Tubing Setting Depth:10572 ft.
Tubing Packer Depth:10561 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 937
CALC_BBLS_H2O 937
CALC_MCF_GAS 170
CASING_PRESS 135
MCF_GAS 170
Perforation Data:
Interval Top:10672 ft.# Of Holes:254
Interval Bottom:10990 ft.Hole Size:0.41 in.

Formation CRCRN                   Formation Classification:  DSPW                   Status:  SI - 8/1/2020                  Interval Top: 10621 ft.    Interval Bottom: 10650 ft.

 Completed Information for Formation CORCORAN
1st Production Date:11/1/2008Choke Size: 
Formation Name:CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/22/2008
Treatment Summary:THIS ZONE WAS PREVIOUSLY TREATED ON 10-22-2008. THE ZONE REPRESENTS THE BASALMOST CORCORAN FORMATION. SEE DOCS #'S 01697152 OR 1706532 FOR MORE DETAILS.
Tubing Size:2.375 in.Tubing Setting Depth:10572 ft.
Tubing Packer Depth:10561 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:10621 ft.# Of Holes:12
Interval Bottom:10650 ft.Hole Size:0.34 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
11/20/2024
Defined Inactive (UIC)YDefined Inactive
06/30/2022
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No