Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10386
Well Classification: GW Status: PR - 12/1/2011
Well Name/No:BANTA RIDGE FED #7-18-1-103
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:LOCIN OIL CORPORATION - 51130
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 010178
Facility Status:PRStatus Date12/1/2011
FacilityID:269705LocationID:316371
County:RIO BLANCO #103Location:NWSE 18 1S103W 6
Field:BANTA RIDGE - #5200Elevation:5864 ft.
Planned Location:2418FSL  2391 FELLat/Long: 39.960497 / -108.997918Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.960570 / -108.997960Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2011             Measured TD: 4390 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2011
Wellbore Permit
Permit #:20031631 Expiration Date:10/7/2004
Prop Depth/Form:4444 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: MNCSB , Formation: MANCOS B , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 4444 ft., Weight: 10.5 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 100 ft., Bottom: 4444 ft.

Wellbore Completed
Completion Date:12/2/2003
Spud Date:10/10/2003Spud Date Is:ACTUAL
Measured TD:4390 ft.Measured PB depth:4335 ft.
True Vertical TD:True Vertical PB depth:
Log Types:AIT-GR-SP; LDT-CNL;CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 308 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 0 ft., Bottom: 308 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4388 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 762 ft., Bottom: 4388 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SEGO2414 ft.2556 ft.NN
CASTLEGATE2936 ft.NN
MANCOS B4105 ft.4260 ft.NN

Formation MNCSB                   Formation Classification:  GW                   Status:  PR - 12/1/2011                 Interval Top: 4116 ft.    Interval Bottom: 4244 ft.

 Completed Information for Formation MANCOS B
1st Production Date:N/AChoke Size:0.313 in.
Formation Name:MANCOS BCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:12/2/2003
Treatment Summary:FRAC ZONE 4218-4244' W/413 BBL GEL FLUID 70Q FOAM,809,068 SCF N2 & 101,000# 20/40 SND; FRAC ZONE 4116-4176' W/422 BBL GEL FLUID 70Q FOAM, 871,297 SCF N2 & 99,000# 20/40 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:4272 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/13/2003Test Method:PUMPING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 68
CALC_BBLS_H2O 5
CALC_BBLS_OIL 68
CALC_GOR 5735
CALC_MCF_GAS 390
CASING_PRESS 195
MCF_GAS 390
TUBING_PRESS 195
Perforation Data:
Interval Top:4116 ft.# Of Holes:74
Interval Bottom:4244 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
11/2023 - 10/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)954
GOR
GOR DeterminationMCFE
Average BOE per Day0.453
Average MCFE per Day2.617

 Federal Financial Assurance  i 

 Tribal Well  i No