Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10368
Well Classification: GW Status: PR - 11/1/2025
Well Name/No:PINTO GULCH FEDERAL #T68-18G
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 58002
Facility Status:PRStatus Date11/1/2025
FacilityID:269193LocationID:316363
County:RIO BLANCO #103Location:SWSE 18 1N97W 6
Field:PICEANCE CREEK - #68800Elevation:6385 ft.
Basin:PICEANCE BASIN  
Planned Location:440FSL  1559 FELLat/Long: 40.048909 / -108.317288Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.048960 / -108.317050Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/1/2025             Measured TD: 14690 ft.    Vertical TD: 14683 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/1/2025
Wellbore Permit
Permit #:Expiration Date:8/24/2004
Proposed Depth/Form:14000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: , Depth: 80 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 125, Top: 0 ft., Bottom: 80 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:12/31/2003Spud Date Is:ACTUAL
Measured TD:14690 ft.Measured PB depth:14465 ft.
True Vertical TD:14683 ft.True Vertical PB depth:14448 ft.
Log Types:
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2650 ft., Weight: 68-61 , Citings Type: ACTUAL
Cement:Sacks: 1575, Top: 0 ft., Bottom: 2650 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 5703 ft., Weight: 53.5 , Citings Type: ACTUAL
Cement:Sacks: 779, Top: 5703 ft., Bottom: 8672 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8672 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 746, Top: 2150 ft., Bottom: 5703 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7.625 in., Size: 4.5 in., Top: 0 ft., Depth: 14677 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: 1330, Top: 6273 ft., Bottom: 14677 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
COZZETTE12282 ft.13152 ft.NN
CORCORAN13152 ft.13613 ft.NN
SEGO13613 ft.14159 ft.NN
CASTLEGATE14159 ft.14399 ft.NN

Formation CSLGT                   Formation Classification:  GW                   Status:  SI - 8/1/2021                  Interval Top: 13970 ft.    Interval Bottom: 14186 ft.

 Completed Information for Formation CASTLEGATE
1st Production Date:5/2/2004Choke Size: 
Formation Name:CASTLEGATECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2004
Treatment Summary:FRAC'D W/A TOTAL OF 45,546 GALS OF FLUID AND 58,500 #'S PROPPANT. SET FRAC PLUG @ 13640'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CSLGT.
Perforation Data:
Interval Top:13970 ft.# Of Holes:32
Interval Bottom:14186 ft.Hole Size:2.625 in.

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 11/1/2025                 Interval Top: 13630 ft.    Interval Bottom: 13634 ft.

 Completed Information for Formation SEGO
1st Production Date:5/2/2004Choke Size:0.375 in.
Formation Name:SEGOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2004
Treatment Summary:FRAC'D W/A TOTAL OF 29,000 #'S PROPPANT. WELL SCREENED OUT. SET CFP @ 13634'. 15,000# SD. LEFT IN WELLBORE. REFRAC'D W/A TOTAL OF 101,000 #'S OF PROPPANT. WELL SCREENED OUT
Tubing Size:2.375 in.Tubing Setting Depth:12356 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/2/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 1
CALC_BBLS_H2O 21
CALC_BBLS_OIL 1
CALC_GOR 118000
CALC_MCF_GAS 118
CASING_PRESS 947
MCF_GAS 118
TUBING_PRESS 453
Perforation Data:
Interval Top:13630 ft.# Of Holes:16
Interval Bottom:13634 ft.Hole Size:2.625 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 11/1/2025                 Interval Top: 13420 ft.    Interval Bottom: 13424 ft.

 Completed Information for Formation CORCORAN
1st Production Date:5/2/2004Choke Size:0.375 in.
Formation Name:CORCORANCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2004
Treatment Summary:FRAC'D W/46 K #'S PROPPANT.
Tubing Size:2.375 in.Tubing Setting Depth:12356 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/2/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 32
BBLS_OIL 1
CALC_BBLS_H2O 32
CALC_BBLS_OIL 1
CALC_GOR 177000
CALC_MCF_GAS 177
CASING_PRESS 747
MCF_GAS 177
TUBING_PRESS 453
Perforation Data:
Interval Top:13420 ft.# Of Holes:16
Interval Bottom:13424 ft.Hole Size:2.625 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 11/1/2025                 Interval Top: 12635 ft.    Interval Bottom: 13234 ft.

 Completed Information for Formation COZZETTE
1st Production Date:5/2/2004Choke Size:0.375 in.
Formation Name:COZZETTECommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2004
Treatment Summary:FRAC'D W/A TOTAL OF 514,000 #'S PROPPANT AND 266,311 GALS. OF FLUID. VERY LITTLE GAS SHOW. SET CFP @ 12875'. AFTER PERFING REMAINDER OF COZZ, SET CBP @ 12030'. CIRC. DRLD OUT ALL PLUGS. SET PRELIMINARY TBG & TURNED TO SALES.
Tubing Size:2.375 in.Tubing Setting Depth:12356 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/2/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 0
CALC_BBLS_H2O 10
CALC_BBLS_OIL 0
CALC_MCF_GAS 56
CASING_PRESS 947
MCF_GAS 56
TUBING_PRESS 453
Perforation Data:
Interval Top:12635 ft.# Of Holes:96
Interval Bottom:13234 ft.Hole Size:2.625 in.

Formation RLNS                     Formation Classification:  GW                     Status:  AB - 5/12/2004                 Interval Top: 12186 ft.    Interval Bottom: 12190 ft.

 Completed Information for Formation ROLLINS
1st Production Date:5/2/2004Choke Size: 
Formation Name:ROLLINSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2004
Treatment Summary:SET CIBP @ 13930'. PMP'D KCL AND SET CIBP @ 12290'. PERF'D AND WELL WENT ON VACUUM. SQZ'D PERFS W/20.5 BBLS CLG CMT. DRLD THROUGH CMT & PLUGS TO 13930'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RLNS.
Perforation Data:
Interval Top:12186 ft.# Of Holes:16
Interval Bottom:12190 ft.Hole Size:3.125 in.

Formation CMEO                     Formation Classification:  GW                     Status:  CM - 10/29/2005                Interval Top: 11920 ft.    Interval Bottom: 12026 ft.

 Completed Information for Formation CAMEO
1st Production Date:5/2/2004Choke Size: 
Formation Name:CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2004
Treatment Summary:RIH AND SET CBP @ 12050. FRAC'D W/ 156000 GALS PROPPANT. SET PLUG @ 11670
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CMEO.
Perforation Data:
Interval Top:11920 ft.# Of Holes:32
Interval Bottom:12026 ft.Hole Size:2.625 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/1/2025                 Interval Top: 10799 ft.    Interval Bottom: 12026 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/2/2004Choke Size:0.375 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2004
Treatment Summary:SET CBP @ 12050'. FRAC'D W/ 156,000 GALS. PROPPANT, SET CBP @ 11670'. PERF'D & FRAC'D W/ 142,000 GALS PROPPANT. SET PLUG @ 11330. PERF'D & FRAC'D W/ 56,000 GALS. PROPPANT. SET CFP @ 11110'. PERF'D & FRAC'D W/ 104,000 GALS PROP. MILLED OUT PLUGS DOWN TO 13139'. LOST BHA & 21 JTS TBG IN HOLE. FISH REC'D & MILLED DOWN TO 13824'.
Tubing Size:2.375 in.Tubing Setting Depth:12356 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/2/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 155
BBLS_OIL 6
CALC_BBLS_H2O 155
CALC_BBLS_OIL 6
CALC_GOR 144833
CALC_MCF_GAS 869
CASING_PRESS 947
MCF_GAS 869
TUBING_PRESS 453
Perforation Data:
Interval Top:10799 ft.# Of Holes:144
Interval Bottom:12026 ft.Hole Size:2.625 in.

Formation WMFK                     Formation Classification:  GW                     Status:  CM - 5/1/2012                  Interval Top: 10799 ft.    Interval Bottom: 11660 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:5/2/2004Choke Size: 
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:5/2/2004
Treatment Summary:PERF'D & FRAC'D W/ 142000 GALS PROPPANT. SET PLUG @ 11330. PERF'D & FRAC'D W/ 56000 GALS PROPPANT.SET PLUG @ 11110. PERF'S & FRAC'D W/ 104,000 GALS. PROP. MILLED OUT PLUGS DOWN TO 13139. LOST BNA & 21 JTS TBG IN HOLE. W/O SUPPLEMENT. FISH REC'D & MILLED DOWN TO 13824'. RIH W/ 2 3/8" TBG. TO 12356.' FRAC'D 9-5-04
Tubing Size:2.375 in.Tubing Setting Depth:12356 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:10799 ft.# Of Holes:112
Interval Bottom:11660 ft.Hole Size:2.625 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)644
GOR
GOR DeterminationMCFE
Average BOE per Day0.309
Average MCFE per Day1.780

 Federal Financial Assurance  i Y

 Tribal Well  i No