Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10367
Well Classification: GW Status: PR - 10/1/2011
Well Name/No:FEDERAL #398-7-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 60743
Facility Status:PRStatus Date10/1/2011
FacilityID:269653LocationID:316362
County:RIO BLANCO #103Location:NENW 7 3S98W 6
Field:SULPHUR CREEK - #80090Elevation:6697 ft.
Basin:PICEANCE BASIN  
Planned Location:966FNL  2223 FWLLat/Long: 39.807982 / -108.435359Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.807980 / -108.435387Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2011             Measured TD: 10114 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2011
Wellbore Permit
Permit #:20064284 Expiration Date:8/24/2007
Proposed Depth/Form:10100 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: CMEO , Formation: CAMEO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: CMEOC , Formation: CAMEO COAL , Order: , Unit Acreage: , Drill Unit: NE NW
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 8500 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 795, Top: 3250 ft., Bottom: 8500 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4250 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:5/9/2006
Spud Date:3/19/2006Spud Date Is:ACTUAL
Measured TD:10114 ft.Measured PB depth:10000 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL/GR/CCL, CALIPER/CV/GR, PE- CD/GR, PE-AI/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2976 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 635, Top: 0 ft., Bottom: 2976 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 2700 ft., Depth: 10100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1550, Top: 2700 ft., Bottom: 10100 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2643 ft.NN
OHIO CREEK5433 ft.NN
WILLIAMS FORK5583 ft.NN
CAMEO7913 ft.NN
ILES8407 ft.NN
LOYD SS9622 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  SI - 7/1/2025                  Interval Top: 9028 ft.    Interval Bottom: 9642 ft.

 Completed Information for Formation SEGO
1st Production Date:N/AChoke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/27/2006
Treatment Summary:28K GALS SW W/50%N2, 58K GALS SW PAD, 221K GALS SW CARRYING 251LBS 30/50 WHITE SAND, FLUSHED W/18KGALS SW
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:9028 ft.# Of Holes:66
Interval Bottom:9642 ft.Hole Size:0.25 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 7/1/2025                  Interval Top: 8720 ft.    Interval Bottom: 8886 ft.

 Completed Information for Formation CORCORAN
1st Production Date:N/AChoke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/28/2006
Treatment Summary:8K GALS SW W/ 50%N2, 15K GALS SW PAD, 51K GALS SW CARRYING 62K LBS 30/50 BROWN SAND, FLUSHED W/ 5670 GALS SW
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:8720 ft.# Of Holes:27
Interval Bottom:8886 ft.Hole Size:0.25 in.

Formation CMCRSG                 Formation Classification:  GW                 Status:  CM - 3/20/2020                 Interval Top: 7904 ft.    Interval Bottom: 9642 ft.

 Completed Information for Formation CAMEO-CORCORAN-SEGO
1st Production Date:N/AChoke Size: 
Formation Name:CAMEO-CORCORAN-SEGOCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CMCRSG.
Perforation Data:
Interval Top:7904 ft.# Of Holes:150
Interval Bottom:9642 ft.Hole Size:0.25 in.

Formation CMEO                     Formation Classification:  GW                     Status:  PR - 10/1/2011                 Interval Top: 7904 ft.    Interval Bottom: 8362 ft.

 Completed Information for Formation CAMEO
1st Production Date:N/AChoke Size: 
Formation Name:CAMEOCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/28/2006
Treatment Summary:16K GALS SW W/50%N2, 33K GALS SW PAD, 115K GALS SW CARRYING 158K LBS 30/50 BROWN SAND, FLUSHED W/ 10K GALS SW
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CMEO.
Perforation Data:
Interval Top:7904 ft.# Of Holes:57
Interval Bottom:8362 ft.Hole Size:0.25 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)11
Total Gas Produced (MCF)4660
GOR423636
GOR DeterminationMCFE
Average BOE per Day2.236
Average MCFE per Day12.982

 Federal Financial Assurance  i Y

 Tribal Well  i No