Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10051
Well Classification: GW Status: PR - 10/1/2025
Well Name/No:PICEANCE CREEK #4609
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC57286
Facility Status:PRStatus Date10/1/2025
FacilityID:258164LocationID:316226
County:RIO BLANCO #103Location:NWNW 8 2S97W 6
Field:LOVE RANCH - #51850Elevation:6503 ft.
Basin:PICEANCE BASIN  
Planned Location:1077FNL  601 FWLLat/Long: 39.895271 / -108.312847Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.895320 / -108.312920Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2025             Measured TD:     Vertical TD: 11180 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2025
Wellbore Permit
Permit #:001052 Expiration Date:10/2/2001
Proposed Depth/Form:13000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/18/2001
Spud Date:1/9/2001Spud Date Is:ACTUAL
Measured TD:Measured PB depth:
True Vertical TD:11180 ft.True Vertical PB depth:11000 ft.
Log Types:CBL-GR, CN-LD-AL
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 432 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 432 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 6390 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 1642, Top: 0 ft., Bottom: 6390 ft., Determination Method:
Casing:String Type: 2ND, Hole Size: 6.5 in., Size: 4.5 in., Top: , Depth: 11180 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 11180 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
WASATCH2651 ft.7086 ft.NN
MESAVERDE7086 ft.10523 ft.NN
CAMEO10523 ft.11031 ft.NN
ROLLINS11031 ft.11194 ft.NN
COZZETTE11194 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/1/2025                 Interval Top: 11 ft.    Interval Bottom: 8038 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:6/18/2001Choke Size:1.000 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:PRODUCING
Open Hole Completion:No
Formation Treatment
Treatment Date:6/18/2001
Treatment Summary:PERFORATE AND FRACTURE. TOTAL SAND INJECTED 761,750 POUNDS AND TOTAL FRAC FLUID INJECTED 935 BARRELS.
Tubing Size:2.375 in.Tubing Setting Depth:9413 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/20/2001Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 209
BBLS_OIL 0
CALC_BBLS_H2O 209
CALC_BBLS_OIL 0
CALC_MCF_GAS 1223
CASING_PRESS 770
MCF_GAS 1223
TUBING_PRESS 225
Perforation Data:
Interval Top:11 ft.# Of Holes:100
Interval Bottom:8038 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)9454
GOR
GOR DeterminationMCFE
Average BOE per Day4.472
Average MCFE per Day25.956

 Federal Financial Assurance  i 

 Tribal Well  i No