Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-09710
Well Classification: GW Status: PR - 5/14/2012
Well Name/No:PICEANCE CREEK UNIT #T27-18G
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:45448
Facility Status:PRStatus Date5/14/2012
FacilityID:232039LocationID:316074
County:RIO BLANCO #103Location:SWSW 18 2S96W 6
Field:PICEANCE CREEK - #68800Elevation:7405 ft.
Basin:PICEANCE BASIN  
Planned Location:812FSL  1186 FWLLat/Long: 39.871632 / -108.214483Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.871780 / -108.214380Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/14/2012             Measured TD: 6060 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/14/2012
Wellbore PermitDIRECTIONAL
Permit #:941028 Expiration Date:2/5/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:COD-035679
Formation And Spacing:Code: WSTCG , Formation: WASATCH G , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/14/1994
Measured TD:6060 ft.Measured PB depth:6002 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1905 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 1905 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6023 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 385, Top: 3452 ft., Bottom: 6023 ft., Determination Method: CALC
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 3452 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 935, Top: 0 ft., Bottom: 3452 ft., Determination Method: CALC

Formation WSTCG                   Formation Classification:  GW                   Status:  CM - 5/27/2004                 Interval Top: 5858 ft.    Interval Bottom: 5949 ft.

 Completed Information for Formation WASATCH G
1st Production Date:N/AChoke Size: 
Formation Name:WASATCH GCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/14/1994
Treatment Summary:EXISTING PERFS. FOAMED PERFS W/75 BBLS FOAM, CO TO TOP OF CIBP @ 6002'
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WSTCG.
Perforation Data:
Interval Top:5858 ft.# Of Holes:45
Interval Bottom:5949 ft.Hole Size:4 in.

Formation WSTC                     Formation Classification:  GW                     Status:  PR - 5/14/2012                 Interval Top: 3020 ft.    Interval Bottom: 5949 ft.

 Completed Information for Formation WASATCH
1st Production Date:5/27/2004Choke Size:0.750 in.
Formation Name:WASATCHCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:10/14/1994
Treatment Summary:CO TO TOP OF CIBP @ 6002'. FOAMED EXISTING PERFS 5858-5949 W/75 BBLS FOAM. ADDED PERFS 3020-5564 & FRAC'D W/17,375 GALS 1/2 PPG; 47,100 GALS 2 PPG; 1000 GALS 8 PPG & 75 BBLS FOAM.
Tubing Size:2.875 in.Tubing Setting Depth:5943 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/27/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 519
CASING_PRESS 65
MCF_GAS 519
Perforation Data:
Interval Top:3020 ft.# Of Holes:57
Interval Bottom:5949 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)56498
GOR
GOR DeterminationMCFE
Average BOE per Day26.748
Average MCFE per Day155.123

 Federal Financial Assurance  i Y

 Tribal Well  i No