| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/30/2025 | Treatment End Date: | 9/30/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 38.5 BBLS FRESH WATER
CONVERTED TO INJECTION 03/23/1969
|
| Total fluid used in treatment (bbls): | 86 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 38 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/25/2024 | Treatment End Date: | 6/25/2024 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER
CONVERTED TO INJECTION 03/23/1969 |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2670 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/23/2021 | Treatment End Date: | 7/23/2021 |
| Treatment Summary: | UIC REPAIR WELLWORK TO CLEAN OUT, ACIDIZE AND REPLACE PACKERS. PLAN RETURN TO INJECTION, PENDING AN APPROVED MIT.
PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID.
CONVERTED TO INJECTION MARCH 23, 1969 |
| Total fluid used in treatment (bbls): | 47 | Max pressure during treatment (psi): | 1800 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/29/2013 | Treatment End Date: | 10/29/2013 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL THRU END OF COILED TUBING AT 6535' |
| Total fluid used in treatment (bbls): | 170 | Max pressure during treatment (psi): | 1500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 75 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 10/6/2010 |
| Treatment Summary: | ACID STIMULATION 10/06/2010 PUMPED 4000 GALLONS OF 20% HCL THROUGH COILED TUBING AT 6600'. STARTING PRESSURE OF 1500 PSI. |
| Formation Treatment |
| Treatment Date: | 8/17/2009 |
| Treatment Summary: | ACID STIMULATION 8/17/09 PUMPED 2000 GALS 20% HCI & 10,500 GALS CLO2 IN FOUR STAGES THROUGH TUBING @ 6534'. AVERAGE 3.6 BPM @ 2191 PSI. |