Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/10/2022 | Treatment End Date: | 10/10/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 bbls) 15% HCL w/ MUTUAL SOLVENT WITH 35 BBLS WATER |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2450 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/17/2021 | Treatment End Date: | 3/17/2021 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 bbls) 15% HCL w/6% CITRIC ACID AND MUTUAL SOLVENT WITH 34 BBLS WATER |
Total fluid used in treatment (bbls): | 83 | Max pressure during treatment (psi): | 1850 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 34 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/25/2019 | Treatment End Date: | N/A |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL WITH 100 BBLS WATER |
Total fluid used in treatment (bbls): | 195 | Max pressure during treatment (psi): | 1780 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 100 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/14/2017 | Treatment End Date: | 8/15/2017 |
Treatment Summary: | Bull head 4000 gallons 15% HCl with 220 gallons parrafin solvent/dispersant, used 360 bbls fresh water. Correction to EOT depth. |
Total fluid used in treatment (bbls): | 460 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 360 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/18/2015 | Treatment End Date: | 5/18/2015 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | 175 | Max pressure during treatment (psi): | 2420 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 1/6/2009 |
Treatment Summary: | USING COILED TUBING UNIT ACIDIZE FORMATION WITH 4000 GALLONS HEATED 20% HCI, EOT @ 6586' |