|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: IJ - 6/1/2024 Measured TD: 6755 ft. Vertical TD: 6698 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW IJ - 6/1/2024 | Wellbore Permit | | Permit #: | | Expiration Date: | 8/14/2020 | Prop Depth/Form: | 4440 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | RANGELY WEBER | Unit Number: | COC47675X | Formation And Spacing: | Code: NAVA , Formation: NAVAJO , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 10, Drill Unit: | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2479 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 685, Top: 0 ft., Bottom: 2479 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6751 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 400, Top: 4498 ft., Bottom: 6751 ft. |
| | |
Wellbore Completed | Completion Date: | 9/22/1984 | Measured TD: | 6755 ft. | Measured PB depth: | 6664 ft. | True Vertical TD: | 6698 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2479 ft., Weight: 36 , Citings Type: COGCC | Cement: | Sacks: 685, Top: 0 ft., Bottom: 2479 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6751 ft., Weight: 23 , Citings Type: COGCC | Cement: | Sacks: 400, Top: 0 ft., Bottom: 6751 ft., Determination Method: CALC | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 7 in., Top: , Depth: 4385 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 670, Top: 570 ft., Bottom: 4385 ft., Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | DAKOTA | 3336 ft. | | | | MORRISON | 3439 ft. | | | | ENTRADA | 4238 ft. | | | | NAVAJO | 4440 ft. | | | | CHINLE | 5060 ft. | | | | WEBER | 5924 ft. | | | |
Formation WEBR Formation Classification: OBW Status: AB - 9/4/2018 Interval Top: 5940 ft. Interval Bottom: 6532 ft. Completed Information for Formation WEBER | 1st Production Date: | 11/14/1984 | Choke Size: | | Formation Name: | WEBER | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 8/30/2018 | Treatment End Date: | N/A | Treatment Summary: | SET RETAINER AT 5871', MIX AND PUMP 165 SKS CEMENT 15.8 PPG IN TUBING, PUMP PRESSURE 800 PSI, BALANCED CEMENT PLUG FROM 5871' TO 5706' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | | Treatment Date: | 5/5/2017 | Treatment End Date: | N/A | Treatment Summary: | TUBING PLUG WAS SET AT 5883' ON 7/09/2015 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WEBR. |
| Perforation Data: | Interval Top: | 5940 ft. | # Of Holes: | 132 | Interval Bottom: | 6532 ft. | Hole Size: | 0.5 in. |
|
Formation NAVA Formation Classification: OBW Status: IJ - 6/1/2024 Interval Top: 4505 ft. Interval Bottom: 5053 ft. Completed Information for Formation NAVAJO | 1st Production Date: | 1/31/2020 | Choke Size: | | Formation Name: | NAVAJO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | 3.5 in. | Tubing Setting Depth: | 4494 ft. | Tubing Packer Depth: | 4409 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NAVA. |
| Perforation Data: | Interval Top: | 4505 ft. | # Of Holes: | 960 | Interval Bottom: | 5053 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | Y |
|
|