Formation Treatment |
Treatment Type: | |
Treatment Date: | 6/29/2023 | Treatment End Date: | N/A |
Treatment Summary: | TUBING PLUG RUN 06/23/2020 SET AT 5676'. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/12/2017 | Treatment End Date: | 12/13/2017 |
Treatment Summary: | BULLHEAD 4000 GALLONS 15% HCL WITH 380 BBLS WATER
FIRST INJECTION 5/20/2002 |
Total fluid used in treatment (bbls): | 475 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 380 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/28/2012 | Treatment End Date: | 8/28/2012 |
Treatment Summary: | PUMPED 95 BBLS 15% HCL THROUGH COILED TUBING FROM SURFACE @ 3.0 BPM @ 800 PSI DISPLACE WITH 50 BBLS FRESH WATER TO BOTTOM PERF @ 7126' |
Total fluid used in treatment (bbls): | 145 | Max pressure during treatment (psi): | 800 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 5/5/2012 |
Treatment Summary: | PUMPED 3000 GALLONS 20% HCL AT 3.0 BPM @ 2000 PSI. |
Formation Treatment |
Treatment Date: | 12/1/2008 |
Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS HEATED 15% HCI, EOT@ 7126' |