| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 7/28/2025 | Treatment End Date: | N/A |
| Treatment Summary: | Well work to repair UIC failure, Pull out of hole FL tubing and packer, clean out, run back in hole with injection equipment. Return to injection pending an approved Form 21.
Correction to perfs reported, bottom perf. 6706 per attached WBD. |
| Total fluid used in treatment (bbls): | 574 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 574 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 570 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/24/2023 | Treatment End Date: | 4/24/2023 |
| Treatment Summary: | Acid stimulation pumped 640 gallons (15.2 BBLS) of 15% HCL, 104 gallons (2.4 BBLS) Acroline, and 273 bbls fresh water.
|
| Total fluid used in treatment (bbls): | 290 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 17 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 273 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/20/2021 | Treatment End Date: | 11/20/2021 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 bbls) 15% HCL w/6% CITRIC ACID AND MUTUAL SOLVENT AND 40 BBLS WATER.
|
| Total fluid used in treatment (bbls): | 87 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/18/2021 | Treatment End Date: | 3/18/2021 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 bbls) 15% HCL w/6% CITRIC ACID AND MUTUAL SOLVENT AND 33 BBLS WATER.
CONVERTED TO INJECTION DECEMBER 1996.
Corrections to perferations reported on previous Form 5A |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 1800 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 33 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/17/2018 | Treatment End Date: | 10/18/2018 |
| Treatment Summary: | PUMPED 4000 GALLONS 15 HCL WITH 50 BBLS WATER. CEMENT SQUEEZE CASING LEAK. CONVERTED TO INJECTION DECEMBER 1996. |
| Total fluid used in treatment (bbls): | 145 | Max pressure during treatment (psi): | 1800 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 8/7/2009 |
| Treatment Summary: | ACID STIMULATION 8/6/09 PUMPED 2000 GALS HEATED 20% HCI & 10,500 GALS CHLORINE DIOXIDE IN FOUR STAGES THROUGH TUBING AT 6246. AVERAGE 4.2 BPM & 2216 PSI. |