Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-09132
Well Classification: ERIW Status: IJ - 5/1/2024
Well Name/No:SHARPLES-MCLAUGHLIN #16X-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date5/1/2024
FacilityID:231462LocationID:315728
County:RIO BLANCO #103Location:SENE 32 2N102W 6
Field:RANGELY - #72370Elevation:5269 ft.
Planned Location:2071FNL  1268 FELLat/Long: 40.101066 / -108.862235Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.101143 / -108.862303Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 5/1/2024             Measured TD: 6575 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 5/1/2024
Wellbore Permit
Permit #:831758 Expiration Date:4/29/1984
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:5/3/1984
Measured TD:6575 ft.Measured PB depth:6489 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2642 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 950, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6574 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3022 ft.
MORRISON3144 ft.
ENTRADA3835 ft.
NAVAJO4100 ft.
CHINLE4695 ft.
WEBER5559 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 5/1/2024                  Interval Top: 5600 ft.    Interval Bottom: 6410 ft.

 Completed Information for Formation WEBER
1st Production Date:6/15/1989Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/25/2023Treatment End Date:1/25/2023
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS)15% HCL W/ MUTUAL SOLVENT, 35 BBLS WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/25/2022Treatment End Date:5/25/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS)15% HCL W/ MUTUAL SOLVENT, 35 BBLS WATER.
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):1350
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/11/2021Treatment End Date:3/11/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS)15% HCL W/6% CITRIC ACID AND MUTUAL SOLVENT, 40 BBLS WATER.
Total fluid used in treatment (bbls):169Max pressure during treatment (psi):1550
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/15/2021Treatment End Date:2/15/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS)15% HCL W/6% CITRIC ACID AND MUTUAL SOLVENT, 66 BBLS WATER.
Total fluid used in treatment (bbls):161Max pressure during treatment (psi):1600
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):66Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/29/2019Treatment End Date:6/29/2019
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH 110 GALLONS (2 BBLS) PAO103 SOLVENT AND 160 BBLS OF FRESH WATER
Total fluid used in treatment (bbls):157Max pressure during treatment (psi):1051
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):160Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/18/2016Treatment End Date:11/18/2016
Treatment Summary:PUMPED 2000 GALLONS 15% HCL WITH 30 GALLONS MUSOL SOLVENT
Total fluid used in treatment (bbls):128Max pressure during treatment (psi):1560
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/22/2015Treatment End Date:10/22/2015
Treatment Summary:pumped 4000 gallons 15% HCl and 80 gallons solvent
Total fluid used in treatment (bbls):180Max pressure during treatment (psi):1085
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):83Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/22/2014Treatment End Date:1/22/2014
Treatment Summary:ACID STIMULATION WITH 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):175Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Date:5/21/2010
Treatment Summary:ACIDIZE FORMATION WITH 4000 GALLONS 20% HCL, END OF COILED TUBING @ 6481
Formation Treatment
Treatment Date:6/11/2009
Treatment Summary:ACIDIZE FORMATION W/ 4000 GALS 20% HCI, END OF COILED TUBING @ 6489'.
Tubing Size:2.875 in.Tubing Setting Depth:5551 ft.
Tubing Packer Depth:5516 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5600 ft.# Of Holes:36
Interval Bottom:6410 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No