| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/26/2025 | Treatment End Date: | 8/26/2025 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL s/solvent and 42 bbls fresh water. |
| Total fluid used in treatment (bbls): | 137 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/17/2024 | Treatment End Date: | 9/17/2024 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL w/solvent and 35 bbls Fresh water |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/9/2023 | Treatment End Date: | 9/9/2023 |
| Treatment Summary: | Pumped 95.2 bbls 15% HCL w/solvent and 35 bbls fresh water |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2450 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/26/2021 | Treatment End Date: | 7/26/2021 |
| Treatment Summary: | PUMPED 2000 GALLONS (4.6 BBLS) 15% HCL W/6% CITRIC ACID AND 90 BBLS WATER
|
| Total fluid used in treatment (bbls): | 137 | Max pressure during treatment (psi): | 1875 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 90 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/12/2017 | Treatment End Date: | 11/12/2017 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL WITH 90 BBLS WATER |
| Total fluid used in treatment (bbls): | 185 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 90 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 10/4/2010 |
| Treatment Summary: | ACID STIMULATION 10-4-2010 PUMPED 4000 GALLONS OF 20% HCL THROUGH END OF COILED TUBING AT 6340' @ 550 PSI. |