Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08687
Well Classification: ERIW Status: IJ - 7/1/2024
Well Name/No:FEE #127X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date7/1/2024
FacilityID:231018LocationID:315547
County:RIO BLANCO #103Location:SENW 20 2N102W 6
Field:RANGELY - #72370Elevation:6534 ft.
Planned Location:1439FNL  1325 FWLLat/Long: 40.131865 / -108.872006Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.131860 / -108.871960Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 7/1/2024             Measured TD: 6544 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 7/1/2024
Wellbore Permit
Permit #:810329 Expiration Date:7/1/1981
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:5/16/1984
Measured TD:6544 ft.Measured PB depth:6515 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3007 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 3007 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6544 ft., Weight: 23,26 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 5050 ft., Bottom: 6544 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: 7 in., Top: , Depth: 4750 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 2450 ft., Bottom: 4750 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3421 ft.
MORRISON3503 ft.
ENTRADA4390 ft.
NAVAJO4521 ft.
CHINLE5124 ft.
WEBER6019 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 7/1/2024                  Interval Top: 6038 ft.    Interval Bottom: 6463 ft.

 Completed Information for Formation WEBER
1st Production Date:5/16/1984Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/29/2022Treatment End Date:N/A
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH 35 BBLS WATER
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/11/2019Treatment End Date:7/11/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 3% CITRIC ACID
Total fluid used in treatment (bbls):47Max pressure during treatment (psi):2250
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/15/2017Treatment End Date:5/15/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL AND 160 BBLS FRESH WATER AT STARTING RATE OF 0.9 BPM @ 1430 PSI
Total fluid used in treatment (bbls):255Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):160Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/9/2015Treatment End Date:N/A
Treatment Summary:PUMP 165 GALLONS SOLVENT AND 4000 GALLONS 15% HCL AT 2.0 BPM
Total fluid used in treatment (bbls):279Max pressure during treatment (psi):2334
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):180Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/21/2014Treatment End Date:7/21/2014
Treatment Summary:ACID STIMULATION, PUMPED 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):270Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):95Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/2/2007
Treatment Summary:ACID STIMULATION 4/2/07 PUMPED 4000 GALLONS 15% HCL THROUGH TUBING AT 6254" 6038-6463
Tubing Size:2.875 in.Tubing Setting Depth:6475 ft.
Tubing Packer Depth:5910 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6038 ft.# Of Holes:126
Interval Bottom:6463 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)111536
GOR
GOR DeterminationMCFE
Average BOE per Day52.728
Average MCFE per Day305.825

 Federal Financial Assurance  i 

 Tribal Well  i No