Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08530
Well Classification: ERIW Status: IJ - 4/30/2024
Well Name/No:UNION PACIFIC #110X-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date4/30/2024
FacilityID:230861LocationID:315459
County:RIO BLANCO #103Location:NESW 21 2N102W 6
Field:RANGELY - #72370Elevation:5304 ft.
Planned Location:1439FSL  1409 FWLLat/Long: 40.125185 / -108.852705Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.125269 / -108.852743Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 4/30/2024             Measured TD: 6559 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 4/30/2024
Wellbore Permit
Permit #:806677 Expiration Date:10/11/1980
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5870 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom:

Wellbore Completed
Completion Date:7/26/1980
Spud Date:7/7/1980Spud Date Is:ACTUAL
Measured TD:6559 ft.Measured PB depth:6506 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 798 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 485, Top: 0 ft., Bottom: 798 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6545 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 4108 ft., Bottom: 6545 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5854 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 353, Top: 0 ft., Bottom: 5854 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA2283 ft.
FRONTIER3029 ft.
DAKOTA3382 ft.NN
MORRISON3477 ft.NN
ENTRADA4300 ft.NN
NAVAJO4470 ft.NN
WEBER5960 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 4/30/2024                 Interval Top: 5960 ft.    Interval Bottom: 6457 ft.

 Completed Information for Formation WEBER
1st Production Date:10/7/1980Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/29/2024Treatment End Date:4/29/2024
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/27/2023Treatment End Date:1/27/2023
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH MUTUAL SOLVENT AND INHIBITORS, 35 BBLS OF WATER.
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/12/2019Treatment End Date:9/12/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID, 80 BBLS OF WATER.
Total fluid used in treatment (bbls):127Max pressure during treatment (psi):2100
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/16/2018Treatment End Date:8/16/2018
Treatment Summary:WELLWORK TO REPAIR CASING. RAN LINER FROM SURFACE TO 5854', ADD ADDITIONAL PERFORATION, ACID STIMULATION WITH 71 BBLS HCL AND 32 BBLS BRINE WATER. COGCC WITNESSED MIT SCHEDULED FOR 8/23/2018
Total fluid used in treatment (bbls):103Max pressure during treatment (psi):1100
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/16/2017Treatment End Date:2/16/2017
Treatment Summary:PUMPED 2000 GALLONS 15% HCL, 110 GALLONS SOLVENT AND 153.8 BBLS FRESH WATER
Total fluid used in treatment (bbls):204Max pressure during treatment (psi):2605
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):153Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/14/2015Treatment End Date:11/14/2015
Treatment Summary:PUMPED 2000 GALLONS 15% HCL AND 102 GALLONS MUTUAL SOLVENT
Total fluid used in treatment (bbls):250Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):200Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/8/2014Treatment End Date:12/8/2014
Treatment Summary:PUMPED 4000 GALLONS OF 15% HCL AT 2.6 BPM @ 2300 PSI
Total fluid used in treatment (bbls):305Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):210Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5871 ft.
Tubing Packer Depth:5784 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5960 ft.# Of Holes:138
Interval Bottom:6457 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)206825
GOR
GOR DeterminationMCFE
Average BOE per Day97.548
Average MCFE per Day565.804

 Federal Financial Assurance  i 

 Tribal Well  i No