Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08492
Well Classification: ERIW Status: IJ - 12/21/2021
Well Name/No:EMERALD #82X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date12/21/2021
FacilityID:230823LocationID:315436
County:RIO BLANCO #103Location:NENW 26 2N103W 6
Field:RANGELY - #72370Elevation:5571 ft.
Planned Location:1347FNL  1423 FWLLat/Long: 40.117565 / -108.928048Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.117602 / -108.928076Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 12/21/2021             Measured TD: 6821 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 12/21/2021
Wellbore Permit
Permit #:800304 Expiration Date:7/24/1980
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 20, Drill Unit:

Wellbore Completed
Completion Date:6/25/1980
Spud Date:5/11/1980Spud Date Is:ACTUAL
Measured TD:6821 ft.Measured PB depth:6738 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CEMENT BOND LOG
Log Types:New CBL ran on June 26, 2013 - hard copy mailed to Denver office 7/23/2013
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 752 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 752 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 174 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6821 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 6821 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 3251 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 6738 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 1900 ft., Bottom: 6738 ft., Determination Method: CBL
Additional Cement:String Type: 2ND , Top: 3040 ft., Depth: 3340 ft., Bottom: 3340 ft., Sacks: 70, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WEBER6250 ft.6821 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 12/21/2021                Interval Top: 6254 ft.    Interval Bottom: 6704 ft.

 Completed Information for Formation WEBER
1st Production Date:10/11/1990Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/20/2021Treatment End Date:12/20/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 91 BBLS WATER
Total fluid used in treatment (bbls):186Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):91Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/8/2021Treatment End Date:7/8/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/ 6% CITRIC ACID AND 40 BBLS WATER
Total fluid used in treatment (bbls):87Max pressure during treatment (psi):2090
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/26/2019Treatment End Date:11/26/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL 6% CITRIC MUTSOL, 38 BBLS FRESH WATER
Total fluid used in treatment (bbls):85Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):38Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/28/2015Treatment End Date:3/28/2015
Treatment Summary:ACID STIMULATION WITH 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):165Max pressure during treatment (psi):2350
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):70Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:10/23/2013Treatment End Date:N/A
Treatment Summary:RAN LINER AND RE-PERF INJECTION ZONE
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/9/2011
Treatment Summary:SHOOT ADDITIONAL PERFS 4SPF 39 GRAMS (6656-6682) (6606-6632) (6554-6586) AMD 6516-6536) TOTAL OF 104'
Tubing Size:2.875 in.Tubing Setting Depth:6239 ft.
Tubing Packer Depth:6128 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6254 ft.# Of Holes:396
Interval Bottom:6704 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)307343
GOR
GOR DeterminationMCFE
Average BOE per Day143.255
Average MCFE per Day830.865

 Federal Financial Assurance  i 

 Tribal Well  i No