Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/1/2023 | Treatment End Date: | 3/1/2023 |
Treatment Summary: | Pumped 4000 gallons (95.2 bbl) 15% HCL w/inhibitor and 35 bbl fresh water |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2300 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 7/10/2019 | Treatment End Date: | 7/10/2019 |
Treatment Summary: | PUMPED 1850 GALLONS (44 BBLS) 15% HCL w/ 3% CITRIC ACID AND 60 BBLS WATER. |
Total fluid used in treatment (bbls): | 104 | Max pressure during treatment (psi): | 1945 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 44 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 60 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/22/2017 | Treatment End Date: | 12/22/2017 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL WITH 140 BBLS WATER |
Total fluid used in treatment (bbls): | 235 | Max pressure during treatment (psi): | 850 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 140 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/27/2015 | Treatment End Date: | 3/27/2015 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | 165 | Max pressure during treatment (psi): | 2300 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 70 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 4/14/2011 |
Treatment Summary: | ACID STIMULATION WITH 4000 GALLONS 20% HCL THROUGH END OF COILED TUBING AT 6153' |
Formation Treatment |
Treatment Date: | 10/15/2009 |
Treatment Summary: | ACID STIMULATION 10/16/09 PUMPED 4000 GALLONS OF 20% HCI |