| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/26/2025 | Treatment End Date: | 6/26/2025 |
| Treatment Summary: | Pumped 2000 gallons (47.6 BBLS) 15% HCL w/solvent and 35 BBLS Fresh water. |
| Total fluid used in treatment (bbls): | 83 | Max pressure during treatment (psi): | 2333 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/12/2024 | Treatment End Date: | 12/13/2024 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 80 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 128 | Max pressure during treatment (psi): | 1700 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 5/23/2024 | Treatment End Date: | 5/23/2024 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 83 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 2/18/2021 | Treatment End Date: | 2/18/2021 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID WTIH MUTUAL SOLVENT AND 47 BBLS WATER
|
| Total fluid used in treatment (bbls): | 95 | Max pressure during treatment (psi): | 2300 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 47 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 6/7/2010 |
| Treatment Summary: | ACID STIMULATION 06/07/2010 PUMPED 4000 GALLONS OF HEATED 20% HCI THROUGH 1.25" COILED TUBING AT 6340-6391 AT STARTING PRESSURE OF 1400 PSI |
| Formation Treatment |
| Treatment Date: | 7/14/2009 |
| Treatment Summary: | ACID STIMULATION 7-14-2009 PUMPED 4000 GALLONS OF HEATED 20% HCL THROUGH SIE AT 6545' SIE (SPECIALIZED INJECTION EQUIPMENT). |