Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08072
Well Classification: ERIW Status: IJ - 1/1/2022
Well Name/No:EMERALD #70X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date1/1/2022
FacilityID:230409LocationID:315203
County:RIO BLANCO #103Location:SENE 25 2N103W 6
Field:RANGELY - #72370Elevation:5378 ft.
Planned Location:1439FNL  1288 FELLat/Long: 40.117235 / -108.900127Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.117342 / -108.899931Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 1/1/2022             Measured TD: 6628 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 1/1/2022
Wellbore Permit
Permit #:10001 Expiration Date:7/21/1981
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:3/1/1978
Spud Date:2/6/1978Spud Date Is:ACTUAL
Measured TD:6628 ft.Measured PB depth:6607 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 50 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 93, Top: 0 ft., Bottom: 50 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2418 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 0 ft., Bottom: 675 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6628 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: , Bottom: 6628 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5625 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 255, Top: 0 ft., Bottom: 5625 ft., Determination Method: CALC
Additional Cement:String Type: 1ST , Top: 3830 ft., Depth: 3892 ft., Bottom: 3862 ft., Sacks: 50, Method: Squeeze
Additional Cement:String Type: 1ST , Top: 4150 ft., Depth: 4199 ft., Bottom: 4239 ft., Sacks: 50, Method: Squeeze
FormationInterval TopLog BottomCoredDSTs
DAKOTA3136 ft.
MORRISON3216 ft.
CURTIS3923 ft.NN
ENTRADA4019 ft.
CARMEL4164 ft.NN
NAVAJO4222 ft.
CHINLE4840 ft.NN
SHINARUMP4963 ft.NN
MOENKOPI5044 ft.NN
WEBER5691 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 1/1/2022                  Interval Top: 5719 ft.    Interval Bottom: 6524 ft.

 Completed Information for Formation WEBER
1st Production Date:4/13/1978Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/23/2019Treatment End Date:4/23/2019
Treatment Summary:PUMPED 2000 GALLONS OF 15% HCL WITH 1030 GALLONS SOLVENT AND 80 BBLS WATER
Total fluid used in treatment (bbls):152Max pressure during treatment (psi):2090
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/18/2008
Treatment Summary:ACIDIZE FORMATION WITH 4500 GALLONS HEATED 15% HCI, EOT @5978'
Tubing Size:2.875 in.Tubing Setting Depth:5635 ft.
Tubing Packer Depth:5548 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5719 ft.# Of Holes:132
Interval Bottom:6524 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)53336
GOR
GOR DeterminationMCFE
Average BOE per Day25.044
Average MCFE per Day145.235

 Federal Financial Assurance  i 

 Tribal Well  i No