Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08042
Well Classification: ERIW Status: IJ - 6/19/2025
Well Name/No:NEAL #7X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date6/19/2025
FacilityID:230380LocationID:315185
County:RIO BLANCO #103Location:NWNE 25 2N103W 6
Field:RANGELY - #72370Elevation:5394 ft.
Basin:PICEANCE BASIN  
Planned Location:160FNL  2638 FELLat/Long: 40.120755 / -108.904957Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.120850 / -108.904760Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 6/19/2025             Measured TD: 6644 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 6/19/2025
Wellbore Permit
Permit #:10001 Expiration Date:10/7/1977
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-033720
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:11/19/1977
Spud Date:10/8/1977Spud Date Is:ACTUAL
Measured TD:6644 ft.Measured PB depth:6557 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 768 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 768 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6644 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 6644 ft., Determination Method: CALC
Additional Cement:String Type: 1ST , Top: 4957 ft., Depth: , Bottom: 5133 ft., Sacks: 20, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 4988 ft., Depth: , Bottom: 5133 ft., Sacks: 20, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
DAKOTA3197 ft.3292 ft.NN
MORRISON3292 ft.4081 ft.NN
ENTRADA4081 ft.4284 ft.NN
NAVAJO4284 ft.5767 ft.NN
WEBER5767 ft.6644 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 6/19/2025                 Interval Top: 5784 ft.    Interval Bottom: 6478 ft.

 Completed Information for Formation WEBER
1st Production Date:11/22/1977Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/16/2025Treatment End Date:N/A
Treatment Summary:UIC Repair, found casing leak from 5096-5127, pumped 20sks cmt balanced plug from 5133-4957 and squeezed 1.2 bbls 13.4# cmt into leak - no success, pumped another 20 sks balanced plug from 5133-4988 and squeezed 2.4 bbls 13.4# cmt into leak - success, RIH w/ inj equipment and plan to return to injection pending an approved MIT.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/18/2025Treatment End Date:6/18/2025
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 37 bbls fresh water.
Total fluid used in treatment (bbls):85Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):37Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/15/2024Treatment End Date:10/15/2024
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL with solvent and 35 bbls fresh water
Total fluid used in treatment (bbls):83Max pressure during treatment (psi):2282
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/19/2022Treatment End Date:5/19/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) OF 15% HCL AND SOLVENT WITH 35 BBLS WATER
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6536 ft.
Tubing Packer Depth:5682 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5784 ft.# Of Holes:327
Interval Bottom:6478 ft.Hole Size:0.5 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
04/30/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No