Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-08029
Well Classification: ERIW Status: IJ - 12/15/2022
Well Name/No:FEE #113X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date12/15/2022
FacilityID:230367LocationID:315175
County:RIO BLANCO #103Location:SESE 19 2N102W 6
Field:RANGELY - #72370Elevation:5308 ft.
Planned Location:147FSL  14 FELLat/Long: 40.121705 / -108.876876Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.121695 / -108.876738Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 12/15/2022             Measured TD: 6558 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 12/15/2022
Wellbore Permit
Permit #:10001 Expiration Date:9/30/1977
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:3/19/1981
Measured TD:6558 ft.Measured PB depth:6525 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 775 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 775 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6557 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 6556 ft., Determination Method: CALC
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 3000 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 3000 ft., Bottom: 6567 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
DAKOTA3178 ft.
MORRISON3266 ft.
ENTRADA4054 ft.
NAVAJO4256 ft.
WEBER5747 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 12/15/2022                Interval Top: 5754 ft.    Interval Bottom: 6459 ft.

 Completed Information for Formation WEBER
1st Production Date:11/1/1977Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/14/2022Treatment End Date:12/14/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT AND 35 BBLS WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/13/2019Treatment End Date:7/13/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/3% CITRIC ACID AND 45 BBLS WATER.
Total fluid used in treatment (bbls):92Max pressure during treatment (psi):2156
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/6/2017Treatment End Date:8/7/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 160 BBLS WATER
Total fluid used in treatment (bbls):255Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):160Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/6/2016Treatment End Date:10/6/2016
Treatment Summary:PUMPED 2000 GALLONS 15% HCL AND 30 GALLONS MUSOL SOLVENT, 200 BBLS FRESH WATER
Total fluid used in treatment (bbls):248Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):200Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/31/2014Treatment End Date:10/31/2014
Treatment Summary:PUMPED 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):234Max pressure during treatment (psi):2350
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):139Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/10/2010
Treatment Summary:ACID STIMULATION 3/10/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 5719.5' AT 1 BPM AT A STARTING PRESSURE OF 2572 PSI
Tubing Size:2.875 in.Tubing Setting Depth:5719 ft.
Tubing Packer Depth:5494 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5754 ft.# Of Holes:243
Interval Bottom:6459 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)77358
GOR
GOR DeterminationMCFE
Average BOE per Day36.666
Average MCFE per Day212.673

 Federal Financial Assurance  i 

 Tribal Well  i No