|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: IJ - 12/1/2025 Measured TD: 6598 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW IJ - 12/1/2025 | | Wellbore Permit | VERTICAL | | Permit #: | | Expiration Date: | 6/7/2028 | | Proposed Depth/Form: | 6610 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | Rangely Weber | Unit Number: | COC 047675X | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 2-27 , Unit Acreage: 19153, Drill Unit: | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 777 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 777 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6598 ft., Weight: 2326 , Citings Type: PLANNED | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 6598 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5747 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 1660 ft., Bottom: 5747 ft. | | Casing: | String Type: 2ND LINER, Hole Size: 7 in., Size: 3.5 in., Top: 5598 ft., Depth: 6598 ft., Weight: -- , Citings Type: PLANNED | | Cement: | Sacks: , Top: 5598 ft., Bottom: 6598 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 1/17/1977 | Spud Date Is: | ACTUAL | | Measured TD: | 6598 ft. | Measured PB depth: | 6580 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | SECTOR CEMENT BOND LOG 5/27/08 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 777 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6595 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Casing: | String Type: 1ST LINER, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5700 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 170, Top: 1660 ft., Bottom: 5700 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | DAKOTA | 3265 ft. | | | | | MORRISON | 3366 ft. | | | | | ENTRADA | 4145 ft. | | | | | NAVAJO | 4350 ft. | | | | | WEBER | 5847 ft. | | | |
Formation WEBR Formation Classification: OBW Status: IJ - 12/9/2025 Interval Top: 6268 ft. Interval Bottom: 6373 ft.| Completed Information for Formation WEBER | | 1st Production Date: | 12/9/2025 | Choke Size: | | | Formation Name: | WEBER | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/7/2026 | Treatment End Date: | N/A | | Treatment Summary: | Per approved Form 33 Doc# 404448597 - Convert well to injection and started injection 12/09/2025.
Originally completion date 4/1/1977
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 11/11/2025 | Treatment End Date: | 11/11/2025 | | Treatment Summary: | Convert well to injection, run 3-1/2 liner from 5548’-6580’, cement in place with a total of 224 sacks of Class G Cement, add new perforations in liner 6268’-6373’ (6 shots per foot at 60 phasing) and acidize (Pumped 2000 gallons 47.6 bbls 15% HCL w/solvent) , run new injection packers.
| | Total fluid used in treatment (bbls): | 47 | Max pressure during treatment (psi): | 1800 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6244 ft. | | Tubing Packer Depth: | 5484 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WEBR. |
| | Perforation Data: | | Interval Top: | 6268 ft. | # Of Holes: | 54 | | Interval Bottom: | 6373 ft. | Hole Size: | 0.24 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|