Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-07581
Well Classification: ERIW Status: IJ - 1/1/2024
Well Name/No:FEE #85X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date1/1/2024
FacilityID:229922LocationID:314936
County:RIO BLANCO #103Location:SESE 29 2N102W 6
Field:RANGELY - #72370Elevation:5235 ft.
Planned Location:348FSL  19 FELLat/Long: 40.107686 / -108.857775Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.107765 / -108.857838Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 1/1/2024             Measured TD: 6395 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 1/1/2024
Wellbore Permit
Permit #:100001 Expiration Date:3/9/1974
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:1/15/1974
Spud Date:12/23/1973Spud Date Is:ACTUAL
Measured TD:6395 ft.Measured PB depth:6370 ft.
True Vertical TD:True Vertical PB depth:
Log Types:NEW CEMENT BOND LOG - HARD COPY SUBMITTED WITH FORM 21 MAILED 1/22/2013
Casing:String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 783 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 783 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6395 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 0 ft., Bottom: 6395 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 6330 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 3865 ft., Bottom: 6330 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3012 ft.
MORRISON3093 ft.
CURTIS3725 ft.
ENTRADA3866 ft.
CARMEL4015 ft.
NAVAJO4085 ft.
CHINLE4674 ft.
SHINARUMP4790 ft.
MOENKOPI4860 ft.
WEBER5533 ft.6395 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 1/1/2024                  Interval Top: 5566 ft.    Interval Bottom: 6329 ft.

 Completed Information for Formation WEBER
1st Production Date:5/29/1974Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/23/2022Treatment End Date:5/23/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 35 BBLS WATER
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/3/2022Treatment End Date:1/3/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 47 BBLS WATER
Total fluid used in treatment (bbls):142Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):47Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/13/2020Treatment End Date:3/13/2020
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 3.8 BBLS MUTUAL SOLVENT
Total fluid used in treatment (bbls):99Max pressure during treatment (psi):1700
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/18/2019Treatment End Date:7/18/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/3% CITRIC ACID AND 45 BBLS WATER.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):2470
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/8/2013Treatment End Date:1/9/2013
Treatment Summary:RUN LINER FROM SURFACE TO 6330' RE-PERF WEBER FORMATION BREAKBOWN PERFORATIONS WITH 15% HCL ACID. PUMPED ACID - SHUT WELL IN.
Total fluid used in treatment (bbls):165Max pressure during treatment (psi):3840
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):59Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5586 ft.
Tubing Packer Depth:5500 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5566 ft.# Of Holes:756
Interval Bottom:6329 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16370
GOR
GOR DeterminationMCFE
Average BOE per Day7.765
Average MCFE per Day45.046

 Federal Financial Assurance  i 

 Tribal Well  i No