Formation Treatment |
Treatment Type: | |
Treatment Date: | 8/2/2018 | Treatment End Date: | N/A |
Treatment Summary: | WELLWORK TO FISH PACKERS AND REPLACE TUBING. WELL WILL REMAIN SHUT UNTIL APPROVAL OF WITNESSED MIT SCHEDULED FOR JUNE 6, 2018, THE WELL WILL THEN BE RETURNED TO ACTIVE INJECTION |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 2/26/2018 | Treatment End Date: | N/A |
Treatment Summary: | TUBING PLUG SET AT 5710' ON 12/28/2017 |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 1/20/2016 | Treatment End Date: | N/A |
Treatment Summary: | WELLWORK TO FISH PACKERS AND RUNIN WELL WITH NEW 2 7/8" FIBERLINED TBG
MIT SCHEDULED FOR 1/5/2016 |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 2/2/2007 |
Treatment Summary: | ACIDIZE FORMATION WITH 3000 GALLONS 15% HCI, EOT @ 6520' |