Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-07530
Well Classification: ERIW Status: IJ - 4/11/2022
Well Name/No:MCLAUGHLIN, S W #8X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date4/11/2022
FacilityID:229872LocationID:314909
County:RIO BLANCO #103Location:SESW 33 2N102W 6
Field:RANGELY - #72370Elevation:5207 ft.
Planned Location:15FSL  1461 FWLLat/Long: 40.092236 / -108.852485Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.092340 / -108.852550Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OTH             Status: IJ - 4/11/2022             Measured TD: 6367 ft.

 Wellbore Data for Original WellboreWellbore Classification: OTH        IJ - 4/11/2022
Wellbore Permit
Permit #:730380 Expiration Date:10/13/1973
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:8/14/1973
Spud Date:6/23/1973Spud Date Is:ACTUAL
Measured TD:6367 ft.Measured PB depth:6350 ft.
True Vertical TD:True Vertical PB depth:
Log Types:NEW CEMENT BOND LOG
Casing:String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 749 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6364 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 2284 ft., Bottom: 6364 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTANN
MORRISON3817 ft.NN
CURTIS3920 ft.NN
ENTRADA4060 ft.NN
CARMEL4120 ft.NN
NAVAJO4700 ft.NN
CHINLE4846 ft.NN
SHINARUMP4915 ft.NN
MOENKOPI5118 ft.NN
WEBER5549 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 4/11/2022                 Interval Top: 5575 ft.    Interval Bottom: 6184 ft.

 Completed Information for Formation WEBER
1st Production Date:8/2/1987Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/8/2022Treatment End Date:4/8/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID AND 65 BBLS WATER CONVERTED TO INJECTION 8/2/1987
Total fluid used in treatment (bbls):112Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):65Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/9/2021Treatment End Date:3/9/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID AND 45 BBLS WATER CONVERTED TO INJECTION 8/2/1987
Total fluid used in treatment (bbls):92Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/9/2020Treatment End Date:3/9/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 1.9 BBLS MUTUAL SOLVENT.
Total fluid used in treatment (bbls):49Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/29/2017Treatment End Date:12/29/2017
Treatment Summary:PUMPED 2000 GALLONS 15% HCL WITH 80 BBLS WATER.
Total fluid used in treatment (bbls):127Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/2/2010
Treatment Summary:PERFORATED 5575-6366' IN SIX RUNS
Tubing Size:2.875 in.Tubing Setting Depth:5556 ft.
Tubing Packer Depth:5520 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
GRAVITY_OIL 34
Perforation Data:
Interval Top:5575 ft.# Of Holes:525
Interval Bottom:6184 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)176664
GOR
GOR DeterminationMCFE
Average BOE per Day82.719
Average MCFE per Day479.759

 Federal Financial Assurance  i 

 Tribal Well  i No