Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/26/2022 | Treatment End Date: | 5/26/2022 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 bbls) 15% HCL WITH SOLVENT AND 35 BBLS WATER |
Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2450 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 9/25/2020 | Treatment End Date: | 9/25/2020 |
Treatment Summary: | PUMPED 4000 GALLONS (47.6 bbls) 15% HCL WITH 1.9 BBLS SOLVENT AND 43 BBLS WATER |
Total fluid used in treatment (bbls): | 92 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 43 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/17/2019 | Treatment End Date: | 4/18/2019 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL WITH 23 BBLS SOLVENT AND 70 BBLS WATER |
Total fluid used in treatment (bbls): | 188 | Max pressure during treatment (psi): | 2200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 70 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/28/2014 | Treatment End Date: | 10/28/2014 |
Treatment Summary: | BULLHEAD 4000 GALLONS 15%HCL |
Total fluid used in treatment (bbls): | 222 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 127 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 11/8/2008 |
Treatment Summary: | ACIDIZE FORMATION WITH 8000 GALLONS 15% HCI, EOT @ 6219 |