Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-07424
Well Classification: ERIW Status: IJ - 6/3/2022
Well Name/No:FEE #79X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date6/3/2022
FacilityID:229767LocationID:314856
County:RIO BLANCO #103Location:SESE 29 2N102W 6
Field:RANGELY - #72370Elevation:5249 ft.
Planned Location:1313FSL  95 FELLat/Long: 40.110335 / -108.858045Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.110360 / -108.858120Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 6/3/2022             Measured TD: 6268 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 6/3/2022
Wellbore Permit
Permit #:720169 Expiration Date:7/16/1972
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:2/13/1985
Measured TD:6268 ft.Measured PB depth:6250 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 771 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 771 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6268 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: , Bottom: 6268 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3032 ft.
MORRISON3126 ft.
CURTIS3780 ft.
ENTRADA3894 ft.
CARMEL4050 ft.
NAVAJO4125 ft.
CHINLE4704 ft.
SHINARUMP4832 ft.
MOENKOPI4920 ft.
WEBER5572 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 6/3/2022                  Interval Top: 5590 ft.    Interval Bottom: 6209 ft.

 Completed Information for Formation WEBER
1st Production Date:5/19/1972Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/26/2022Treatment End Date:5/26/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 bbls) 15% HCL WITH SOLVENT AND 35 BBLS WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/25/2020Treatment End Date:9/25/2020
Treatment Summary:PUMPED 4000 GALLONS (47.6 bbls) 15% HCL WITH 1.9 BBLS SOLVENT AND 43 BBLS WATER
Total fluid used in treatment (bbls):92Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):43Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/17/2019Treatment End Date:4/18/2019
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 23 BBLS SOLVENT AND 70 BBLS WATER
Total fluid used in treatment (bbls):188Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):70Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/28/2014Treatment End Date:10/28/2014
Treatment Summary:BULLHEAD 4000 GALLONS 15%HCL
Total fluid used in treatment (bbls):222Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):127Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/8/2008
Treatment Summary:ACIDIZE FORMATION WITH 8000 GALLONS 15% HCI, EOT @ 6219
Tubing Size:2.875 in.Tubing Setting Depth:6220 ft.
Tubing Packer Depth:5415 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5590 ft.# Of Holes:69
Interval Bottom:6209 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)170080
GOR
GOR DeterminationMCFE
Average BOE per Day79.876
Average MCFE per Day463.298

 Federal Financial Assurance  i 

 Tribal Well  i No