Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-07351
Well Classification: ERIW Status: IJ - 4/21/2023
Well Name/No:LEVISON #30X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date4/21/2023
FacilityID:229694LocationID:314834
County:RIO BLANCO #103Location:SENE 27 2N102W 6
Field:RANGELY - #72370Elevation:5371 ft.
Planned Location:2540FNL  5 FELLat/Long: 40.114216 / -108.819834Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.114340 / -108.819990Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 4/21/2023             Measured TD: 6532 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 4/21/2023
Wellbore Permit
Permit #:10001 Expiration Date:9/4/1971
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-052561
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:12/16/1980
Measured TD:6532 ft.Measured PB depth:6520 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 786 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6532 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3482 ft.
MORRISON3570 ft.
CURTIS4193 ft.
ENTRADA4314 ft.
CARMEL4463 ft.
NAVAJO4529 ft.
CHINLE5116 ft.
SHINARUMP5243 ft.
MOENKOPI5340 ft.
WEBER5978 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 4/21/2023                 Interval Top: 6004 ft.    Interval Bottom: 6409 ft.

 Completed Information for Formation WEBER
1st Production Date:10/25/1975Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/20/2023Treatment End Date:4/20/2023
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL w/6% citric acid and 35 bbls water Converted to injection 10/25/1975
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/24/2020Treatment End Date:6/25/2020
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL w/6% citric acid and 45 bbls water.
Total fluid used in treatment (bbls):92Max pressure during treatment (psi):2410
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/13/2014Treatment End Date:12/13/2014
Treatment Summary:PUMPED 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):249Max pressure during treatment (psi):2460
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):154Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/17/2013Treatment End Date:7/17/2013
Treatment Summary:ACID STIMULATION
Total fluid used in treatment (bbls):170Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):75Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:6495 ft.
Tubing Packer Depth:5755 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6004 ft.# Of Holes:63
Interval Bottom:6409 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)108977
GOR
GOR DeterminationMCFE
Average BOE per Day51.148
Average MCFE per Day296.658

 Federal Financial Assurance  i Y

 Tribal Well  i No