| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/2/2025 | Treatment End Date: | 12/2/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER
|
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/23/2025 | Treatment End Date: | 6/23/2025 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 60 BBLS FRESH WATER. |
| Total fluid used in treatment (bbls): | 155 | Max pressure during treatment (psi): | 1700 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 60 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 5/17/2024 | Treatment End Date: | 5/17/2024 |
| Treatment Summary: | PUPMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 70 BBLS FRESH WATER. |
| Total fluid used in treatment (bbls): | 118 | Max pressure during treatment (psi): | 2600 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 70 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/7/2023 | Treatment End Date: | 8/7/2023 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/inhibitor and 40 bbls fresh water |
| Total fluid used in treatment (bbls): | 88 | Max pressure during treatment (psi): | 2487 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/2/2022 | Treatment End Date: | 8/2/2022 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL with mutual solvent and 35 bbls water. |
| Total fluid used in treatment (bbls): | 83 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/18/2021 | Treatment End Date: | 8/18/2021 |
| Treatment Summary: | PUMPED 2000 GALLONS 47.6 BBLS 15% HCL W/6% CITRIC ACID AND 120 BBLS WATER |
| Total fluid used in treatment (bbls): | 167 | Max pressure during treatment (psi): | 1950 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 120 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/16/2020 | Treatment End Date: | 9/17/2020 |
| Treatment Summary: | PUMPED 2000 GALLONS 47.6 BBLS 15% HCL W/6% CITRIC ACID AND 80 BBLS POTABLE WATER |
| Total fluid used in treatment (bbls): | 127 | Max pressure during treatment (psi): | 1900 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 2/2/2019 | Treatment End Date: | 2/2/2019 |
| Treatment Summary: | ACID STIMULATION WITH 2000 GALLONS 15% HCL, 30 BBLS SOLVENT AND 105 BBLS FRESH WATER. STARTING AT 4.0 BPM AT 2140 PSI. |
| Total fluid used in treatment (bbls): | 183 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 105 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/16/2017 | Treatment End Date: | 8/16/2017 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL WITH 155 GALLONS ADDITIVES, 160 BBLS WATER |
| Total fluid used in treatment (bbls): | 259 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 160 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 3/12/2012 |
| Treatment Summary: | ACID STIMULATION WITH 4000 GALLONS 15% HCL |
| Formation Treatment |
| Treatment Date: | 3/29/2011 |
| Treatment Summary: | ACID STIMULATION 3/29/2011 PUMPED 3100 GALLONS 20% HCL THROUGH COILED TUBING AT 6186' @ .5 BBLS PER MIN AT A MAX PRESSURE OF 1800 PSI. |
| Formation Treatment |
| Treatment Date: | 8/7/2009 |
| Treatment Summary: | ACID STIMULATION 8/7/09 PUMPED 2000 GALS 20% HCI 10,500 GALS CHLORINE DIOXIDE IN FOUR STAGES THROUGH TUBING AT 6660.0 AVERAGE 4.2 BPM @ 2216 PSI |