Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06327
Well Classification: ERIW Status: IJ - 7/1/2021
Well Name/No:M C HAGOOD A #9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date7/1/2021
FacilityID:229236LocationID:314676
County:RIO BLANCO #103Location:SWNE 15 2N103W 6
Field:RANGELY - #72370Elevation:5562 ft.
Planned Location:1961FNL  1979 FWLLat/Long: 40.144825 / -108.944708Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.144962 / -108.944833Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 7/1/2021             Measured TD: 6700 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 7/1/2021
Wellbore Permit
Permit #:900048 Expiration Date:4/19/1990
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:12/21/1947
Spud Date:10/20/1947Spud Date Is:ACTUAL
Measured TD:6700 ft.Measured PB depth:6700 ft.
True Vertical TD:True Vertical PB depth:
Log Types:NO NEW LOGS
Log Types:CEMENT BOND LOG - HARD COPY MAILED WITH FORM 21 4/19/2011
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 611 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 611 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6494 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 5150 ft., Bottom: 6494 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 6472 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 5150 ft., Bottom: 6472 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 270 ft., Depth: 2514 ft., Bottom: , Sacks: 115, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
MANCOS0 ft.
NIOBRARA2615 ft.
FRONTIER3551 ft.
MOWRY3810 ft.
DAKOTA3890 ft.
MORRISON3988 ft.
CURTIS4689 ft.
ENTRADA4790 ft.
NAVAJO4994 ft.
CHINLE5610 ft.
MOENKOPI5810 ft.6029 ft.NN
WEBER6497 ft.6700 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 7/1/2021                  Interval Top: 6494 ft.    Interval Bottom: 6700 ft.

 Completed Information for Formation WEBER
1st Production Date:8/8/2011Choke Size: 
Formation Name:WEBERCommingled:
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/18/2021Treatment End Date:6/19/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT, 45 BBLS WATER CONVERTED TO INJECTION 04-14-2011
Total fluid used in treatment (bbls):140Max pressure during treatment (psi):1170
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6558 ft.
Tubing Packer Depth:6345 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6494 ft.# Of Holes:
Interval Bottom:6700 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)207549
GOR
GOR DeterminationMCFE
Average BOE per Day96.835
Average MCFE per Day561.651

 Federal Financial Assurance  i Y

 Tribal Well  i No