Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 7/20/2021 | Treatment End Date: | 7/20/2021 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 40 BBLS WATER |
Total fluid used in treatment (bbls): | 135 | Max pressure during treatment (psi): | 2085 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/8/2015 | Treatment End Date: | 10/8/2015 |
Treatment Summary: | Pump 165 gallons solvent and 4000 gallons 15% hcl @ 2046psi. |
Total fluid used in treatment (bbls): | 249 | Max pressure during treatment (psi): | 2046 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 150 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/4/2014 | Treatment End Date: | 12/4/2014 |
Treatment Summary: | PUMP 4000 GALLONS 15% AT 3.25 BPM @ 1700 PSI |
Total fluid used in treatment (bbls): | 217 | Max pressure during treatment (psi): | 1700 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 122 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 8/4/2010 |
Treatment Summary: | ACID STIMULATION 08/04/20108 PUMPED 4000 GALLONS OF HEATED 20% HCI THROUGH TUBING AT 6362.8' |
Formation Treatment |
Treatment Date: | 5/7/2002 |
Treatment Summary: | PRODUCER CONVERTED TO INJECTOR 08/04/2005 |