Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/1/2022 | Treatment End Date: | 8/1/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT, 35 BBLS WATER |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/19/2021 | Treatment End Date: | 11/19/2021 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT, 45 BBLS WATER |
Total fluid used in treatment (bbls): | 140 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/29/2021 | Treatment End Date: | 6/29/2021 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 45 BBLS WATER
|
Total fluid used in treatment (bbls): | 92 | Max pressure during treatment (psi): | 2110 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/5/2020 | Treatment End Date: | 8/5/2020 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 52 BBLS WATER |
Total fluid used in treatment (bbls): | 99 | Max pressure during treatment (psi): | 2200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 52 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 8/23/2017 | Treatment End Date: | N/A |
Treatment Summary: | Pulled tubing and packer, run clean out assembly, run in hole with 202 joints fiberlined tubing and 7" loc-set packer., WELL IS CURRENTLY SHUT IN, A WITNESSED MIT IS SCHEDULED FOR 8/22/17. THE WELL WILL BE RETURNED TO SERVICE AFTER APPROVED FORM 21. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 8/17/2017 | Treatment End Date: | N/A |
Treatment Summary: | WELLWORK TO REPLACE TUBING AND PACKER, WELL IS CURRENTLY SHUT IN, A WITNESSED MIT IS SCHEDULED FOR 8/22/17. THE WELL WILL BE RETURNED TO SERVICE AFTER APPROVED FORM 21. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 1/9/2017 | Treatment End Date: | N/A |
Treatment Summary: | AC MCLAUGHLIN 17 SHOWED HIGH CASING PRESSURE, WELL WAS SHUT IN AND WELL WORK COMPLETED TO REPLACE TUBING AND PACKER. THE WELL IS SCHEDULED FOR A WITNESSED MIT ON 1/11/2017 WITH COGCC CHUCK BROWNING |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/5/2014 | Treatment End Date: | 6/5/2014 |
Treatment Summary: | PUMP 15% HCL |
Total fluid used in treatment (bbls): | 245 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 150 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 7/30/2010 |
Treatment Summary: | ACID STIMULATION 7/30/2010 PUMPED 4000 GALLONS 20% HCI THROUGH TUBING 6581.9' AT 4.2 BPM @ 1700 PSI. |
Formation Treatment |
Treatment Date: | 12/9/2009 |
Treatment Summary: | OPEN HOLE 6579-6742'. ACID STIMULATION 12/9/09 PUMPED 4,000 GALS 20% HCI THROUGH TUBING 6581.9'. AVERAGE 2.9 BPM @ 1980 PSI. |