Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06315
Well Classification: ERIW Status: IJ - 7/22/2021
Well Name/No:MCLAUGHLIN, A C #33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date7/22/2021
FacilityID:229225LocationID:314667
County:RIO BLANCO #103Location:SWSW 11 2N103W 6
Field:RANGELY - #72370Elevation:5579 ft.
Planned Location:561FSL  561 FWLLat/Long: 40.151744 / -108.931018Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.151840 / -108.931010Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 7/22/2021             Measured TD: 7000 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 7/22/2021
Wellbore Permit
Permit #:100001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:5/20/1947Spud Date Is:ACTUAL
Measured TD:7000 ft.Measured PB depth:6700 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 27 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 27 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 732 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 732 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6605 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 2258 ft., Bottom: 6605 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3960 ft.NN
MORRISON4050 ft.NN
CURTIS4784 ft.NN
ENTRADA4882 ft.NN
CARMEL5022 ft.NN
NAVAJO5080 ft.NN
CHINLE5710 ft.NN
SHINARUMP5820 ft.NN
MOENKOPI5910 ft.NN
WEBER6610 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 7/22/2021                 Interval Top: 6605 ft.    Interval Bottom: 6700 ft.

 Completed Information for Formation WEBER
1st Production Date:2/19/1986Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/20/2021Treatment End Date:7/20/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 40 BBLS WATER
Total fluid used in treatment (bbls):135Max pressure during treatment (psi):2090
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/27/2010
Treatment Summary:ACID STIMULATION 1/27/10 PUMPED 4000 GALLONS 20% HCL THROUGH TUBING AT 6578.'
Tubing Size:2.875 in.Tubing Setting Depth:6578 ft.
Tubing Packer Depth:6447 ft.Tubing Multiple Packer:Y ft.
Open Hole Top:6605 ft.Open Hole Bottom:6700 ft.
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
GRAVITY_OIL 34
Perforation Data:
Interval Top:6605 ft.# Of Holes:
Interval Bottom:6700 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)309028
GOR
GOR DeterminationMCFE
Average BOE per Day144.754
Average MCFE per Day839.586

 Federal Financial Assurance  i Y

 Tribal Well  i No