Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06287
Well Classification: ERIW Status: IJ - 1/11/2022
Well Name/No:UNION PACIFIC #68-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date1/11/2022
FacilityID:229200LocationID:311808
County:RIO BLANCO #103Location:SESW 32 2N102W 6
Field:RANGELY - #72370Elevation:5258 ft.
Planned Location:711FSL  1947 FWLLat/Long: 40.094176 / -108.869646Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.094234 / -108.869682Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 1/11/2022             Measured TD: 6325 ft.    Vertical TD: 6325 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 1/11/2022
Wellbore Permit
Permit #:10001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:1/1/1949
Measured TD:6325 ft.Measured PB depth:6280 ft.
True Vertical TD:6325 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5677 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 5 in., Top: 5505 ft., Depth: 6322 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 5505 ft., Bottom: 6322 ft., Determination Method: CALC

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 1/11/2022                 Interval Top: 5668 ft.    Interval Bottom: 6250 ft.

 Completed Information for Formation WEBER
1st Production Date:1/18/1989Choke Size: 
Formation Name:WEBERCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/5/2022Treatment End Date:1/5/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT 43 BBLS FRESH WATER
Total fluid used in treatment (bbls):90Max pressure during treatment (psi):2477
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):43Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/1/2020Treatment End Date:4/1/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT 62 BBLS FRESH WATER
Total fluid used in treatment (bbls):109Max pressure during treatment (psi):2485
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):62Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/20/2012
Treatment Summary:PUMPED 4000 GALLONS 15% HCL AT 0.9 BPM @ 1150 PSI END OF COILED TUBING @ 6036'
Formation Treatment
Treatment Date:11/18/2009
Treatment Summary:ACID STIMULATION 11/18/09 PUMPED 4000 GALLONS OF 20% HCI AT 3.6 BPM AVERAGE PRESSURE 2750 PSI THROUGH TUBING AT 6202'.
Tubing Size:2.875 in.Tubing Setting Depth:6203 ft.
Tubing Packer Depth:5426 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5668 ft.# Of Holes:114
Interval Bottom:6250 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)33207
GOR
GOR DeterminationMCFE
Average BOE per Day15.408
Average MCFE per Day89.354

 Federal Financial Assurance  i 

 Tribal Well  i No