Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06287
Well Classification: ERIW Status: IJ - 2/27/2024
Well Name/No:UNION PACIFIC #68-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date2/27/2024
FacilityID:229200LocationID:311808
County:RIO BLANCO #103Location:SESW 32 2N102W 6
Field:RANGELY - #72370Elevation:5258 ft.
Basin:PICEANCE BASIN  
Planned Location:711FSL  1947 FWLLat/Long: 40.094176 / -108.869646Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.094234 / -108.869682Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 2/27/2024             Measured TD: 6325 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 2/27/2024
Wellbore Permit
Permit #:10001 Expiration Date:2/24/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:9/13/1948Spud Date Is:ACTUAL
Measured TD:6325 ft.Measured PB depth:6280 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Log Types:
Casing:String Type: SURF, Hole Size: 16 in., Size: 10.75 in., Top: 0 ft., Depth: 2002 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 950 ft., Bottom: 2002 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 10.75 in., Size: 7 in., Top: 0 ft., Depth: 5677 ft., Weight: 23 20 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 2250 ft., Bottom: 5677 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5 in., Top: 5505 ft., Depth: 6355 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 5505 ft., Bottom: 6322 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
NIOBRARA2080 ft.2797 ft.NN
FRONTIER2797 ft.3070 ft.NN
MOWRY3070 ft.3151 ft.NN
DAKOTA3151 ft.3239 ft.NN
MORRISON3239 ft.3887 ft.NN
CURTIS3887 ft.4013 ft.NN
ENTRADA4013 ft.4178 ft.NN
CARMEL4178 ft.4228 ft.NN
NAVAJO4228 ft.4823 ft.NN
CHINLE4823 ft.4951 ft.NN
SHINARUMP4951 ft.5010 ft.NN
MOENKOPI5010 ft.5666 ft.NN
WEBER5666 ft.6325 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 2/27/2024                 Interval Top: 5668 ft.    Interval Bottom: 6250 ft.

 Completed Information for Formation WEBER
1st Production Date:1/18/1989Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/22/2024Treatment End Date:2/22/2024
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 37 bbls Fresh water.
Total fluid used in treatment (bbls):84Max pressure during treatment (psi):2485
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):37Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/5/2022Treatment End Date:1/5/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT 43 BBLS FRESH WATER
Total fluid used in treatment (bbls):90Max pressure during treatment (psi):2477
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):43Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/1/2020Treatment End Date:4/1/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT 62 BBLS FRESH WATER
Total fluid used in treatment (bbls):109Max pressure during treatment (psi):2485
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):62Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/20/2012
Treatment Summary:PUMPED 4000 GALLONS 15% HCL AT 0.9 BPM @ 1150 PSI END OF COILED TUBING @ 6036'
Formation Treatment
Treatment Date:11/18/2009
Treatment Summary:ACID STIMULATION 11/18/09 PUMPED 4000 GALLONS OF 20% HCI AT 3.6 BPM AVERAGE PRESSURE 2750 PSI THROUGH TUBING AT 6202'.
Tubing Size:2.875 in.Tubing Setting Depth:6202 ft.
Tubing Packer Depth:5426 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5668 ft.# Of Holes:114
Interval Bottom:6250 ft.Hole Size:0.5 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
04/30/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No