Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06278
Well Classification: ERIW Status: IJ - 8/1/2023
Well Name/No:MCLAUGHLIN, S W (SIDETRACK) #6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date8/1/2023
FacilityID:229193LocationID:314648
County:RIO BLANCO #103Location:SESW 33 2N102W 6
Field:RANGELY - #72370Elevation:5214 ft.
Planned Location:636FSL  1942 FWLLat/Long: 40.093936 / -108.850775Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.094040 / -108.850870Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: AB - 6/7/1997             Measured TD: 5623 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        AB - 6/7/1997
Wellbore Permit
Permit #:970135 Expiration Date:2/19/1998
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:12/5/1947
Spud Date:10/24/1947Spud Date Is:ACTUAL
Measured TD:5623 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 37 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 1032 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5623 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
WEBER5518 ft.

Formation WEBR                     Formation Classification:  GW                     Status:  AB - 6/7/1997                  Interval Top: 5518 ft.

 Completed Information for Formation WEBER
1st Production Date:12/14/1947Choke Size:0.000 in.
Formation Name:WEBERCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/5/1947
Treatment Summary:WEBER PLUGGED WITH CEMENTED LINER WHEN WELL SIDETRACKED
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
No Perforation Data was found for formation WEBR.

Sidetrack #01             Wellbore Classification: ERIW             Status: IJ - 8/1/2023             Measured TD: 6532 ft.    Vertical TD: 6032 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: ERIW        IJ - 8/1/2023
Wellbore PermitDIRECTIONAL
Permit #:97-135 Expiration Date:2/19/1998
Prop Depth/Form:6529 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit:RANGELY WEBER SAND UNIT Unit Number:72370
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: 19143, Drill Unit:

Wellbore Completed
Completion Date:7/11/1997
Measured TD:6532 ft.Measured PB depth:
True Vertical TD:6032 ft.True Vertical PB depth:
Top PZ Location:Sec:33 Twp: 2N 102WFootage: 759 FSL  2286 FWLDepth
Bottom Hole Location:Sec:33 Twp: 2N 102WFootage: 748 FSL  2744 FWLDepth
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 37 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 94, Top: 0 ft., Bottom: 37 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 1032 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 1032 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5623 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1135, Top: , Bottom: 5623 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5136 ft., Depth: 6532 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 120, Top: 5136 ft., Bottom: 6532 ft., Determination Method:

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 8/1/2023                  Interval Top: 6046 ft.    Interval Bottom: 6467 ft.

 Completed Information for Formation WEBER
1st Production Date:5/25/2006Choke Size: 
Formation Name:WEBERCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/24/2021Treatment End Date:6/24/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT, 100 BBLS WATER
Total fluid used in treatment (bbls):195Max pressure during treatment (psi):1750
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):100Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/8/2019Treatment End Date:10/8/2019
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH SOLVENT AND 130 BBLS FRESH WATER
Total fluid used in treatment (bbls):225Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):130Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/9/2017Treatment End Date:11/10/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 400 BBLS WATER
Total fluid used in treatment (bbls):495Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):400Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/4/2012Treatment End Date:9/4/2012
Treatment Summary:PUMP 4000 GALLONS 15% HCL A 1.0 BPM AT 1500 PSI
Total fluid used in treatment (bbls):Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/5/2012Treatment End Date:7/5/2012
Treatment Summary:PUMP 4000 GALLONS 15% HCL AT 1.08 BPM @ 1500 PSI.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):15Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/12/2006
Treatment Summary:ACID STIMULATION BY PUMPING 3000 GALS 15% HCL THROUGH TUBING @ A DEPTH OF 5102'
Tubing Size:2.875 in.Tubing Setting Depth:5103 ft.
Tubing Packer Depth:5038 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6046 ft.# Of Holes:109
Interval Bottom:6467 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)92506
GOR
GOR DeterminationMCFE
Average BOE per Day43.274
Average MCFE per Day250.976

 Federal Financial Assurance  i 

 Tribal Well  i No