Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06272
Well Classification: ERIW Status: SI - 5/1/2024
Well Name/No:UNION PACIFIC #36-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:SIStatus Date5/1/2024
FacilityID:229187LocationID:311806
County:RIO BLANCO #103Location:SWSE 32 2N102W 6
Field:RANGELY - #72370Elevation:5264 ft.
Planned Location:660FSL  1980 FELLat/Long: 40.093776 / -108.869866Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.094105 / -108.864855Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: SI - 5/1/2024             Measured TD: 6426 ft.    Vertical TD: 6426 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        SI - 5/1/2024
Wellbore Permit
Permit #:111111 Expiration Date:7/7/1983
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:9/21/1982
Spud Date:7/22/1982Spud Date Is:ACTUAL
Measured TD:6426 ft.Measured PB depth:6419 ft.
True Vertical TD:6426 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5659 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: 5659 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: 5 in., Top: 5494 ft., Depth: 6424 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: , Bottom: 6424 ft., Determination Method:

Formation WEBR                     Formation Classification:  ERIW                     Status:  SI - 5/1/2024                  Interval Top: 5645 ft.    Interval Bottom: 6402 ft.

 Completed Information for Formation WEBER
1st Production Date:4/25/1997Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/4/2022Treatment End Date:8/4/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/CITRIC ACID AND MUTUAL SOLVENT AND 45 BBLS WATER
Total fluid used in treatment (bbls):140Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/15/2021Treatment End Date:2/15/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/CITRIC ACID AND MUTUAL SOLVENT AND 47.0 BBLS WATER
Total fluid used in treatment (bbls):95Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):47Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/7/2020Treatment End Date:8/7/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 50 BBLS WATER
Total fluid used in treatment (bbls):98Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):50Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6198 ft.
Tubing Packer Depth:5405 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5645 ft.# Of Holes:123
Interval Bottom:6402 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)581
GOR
GOR DeterminationMCFE
Average BOE per Day0.278
Average MCFE per Day1.614

 Federal Financial Assurance  i 

 Tribal Well  i No