Formation Treatment |
Treatment Type: | |
Treatment Date: | 1/9/2017 | Treatment End Date: | N/A |
Treatment Summary: | CORRECTION TO TUBING, PACKER DEPTHS AND SETTING DATE SUBMITTED ON DOCUMENT 400602702. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/1/2014 | Treatment End Date: | 5/1/2014 |
Treatment Summary: | 1500 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | 146 | Max pressure during treatment (psi): | 1400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 96 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 7/13/2009 |
Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS HEATED 20% HCL, END OF COILED TUBING @5656'. PLEASE NOTE THAT 5/26/09 FORM 21 HAD AN INCORRECT TUBING & PACKER DEPTHS - SEE ATTACHED TUBING LANDING DETAIL. |