Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06253
Well Classification: OBW Status: IJ - 5/1/2025
Well Name/No:EMERALD #16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date5/1/2025
FacilityID:229168LocationID:314634
County:RIO BLANCO #103Location:NENW 31 2N102W 6
Field:RANGELY - #72370Elevation:5319 ft.
Basin:PICEANCE BASIN  
Planned Location:660FNL  1980 FWLLat/Long: 40.104915 / -108.888426Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.105136 / -108.888269Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: IJ - 5/1/2025             Measured TD: 6415 ft.    Vertical TD: 6415 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        IJ - 5/1/2025
Wellbore Permit
Permit #:100000 Expiration Date:2/24/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/1/1983
Measured TD:6415 ft.Measured PB depth:6339 ft.
True Vertical TD:6415 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 998 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 998 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5695 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: , Bottom: 5695 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: 5.5 in., Top: 5668 ft., Depth: 6385 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 5668 ft., Bottom: 6385 ft., Determination Method: CALC

Formation WEBR                     Formation Classification:  OBW                     Status:  IJ - 10/1/2024                 Interval Top: 5539 ft.    Interval Bottom: 6250 ft.

 Completed Information for Formation WEBER
1st Production Date:10/1/1963Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/24/2025Treatment End Date:N/A
Treatment Summary:Well work to repair, return to injection, POOH with packer clean out well, test casing - good test, upgrade wellhead, Run in hold with dual packer injection setup on FL tubing, test casing again - good test. NOTE: Due to the 5.5” liner top being set 129ft below our top perf at 5539’, we are unable to set a packer within 100’ of top perf per our MOU guidelines. We requested approval by A. Katz to move forward with setting our top packer within 300’ of the top perforation, due to the unique set up of this well. A. Katz Approval 7/1/24 on this well with perfs extending above the liner top. We determined to place the CIBP within 300 ft. of the top perf as outlined in the MOU. Return to Injection pending an approved Form 21. Note: Correction to form 21 (doc # 403852640) perfs Top 5539 - 6250.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:5/11/2022Treatment End Date:N/A
Treatment Summary:TUBING PLUG WAS SET AT 5402' ON 01/15/2020
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5521 ft.
Tubing Packer Depth:5451 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5539 ft.# Of Holes:249
Interval Bottom:6250 ft.Hole Size:0.5 in.

Sidetrack #01             Wellbore Classification:              Status: AB - 8/16/2006             Measured TD:

 Wellbore Data for Sidetrack #01Wellbore Classification:         AB - 8/16/2006
Wellbore PermitDIRECTIONAL
Permit #:20064299 Expiration Date:9/13/2007
Bottom Hole Location:Sec:31 Twp: 2N 102W Footage: 692 FNL  1915 FWL
Proposed Depth/Form:6467 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:FEE
Unit:RANGELY WEBR SD Unit Number:COC 47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:N/A
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
  No formation data to display.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No