Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/5/2022 | Treatment End Date: | 1/5/2022 |
Treatment Summary: | PUMPED 2000 GALLONS (47 BBLS) 15% HCL WITH SOLVENT AND 47 BBLS FRESH WATER.
WELL CONVERTED TO INJECTION 10/24/1958 |
Total fluid used in treatment (bbls): | 94 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 47 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/17/2018 | Treatment End Date: | 5/17/2018 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH 110 GALLONS SOLVENT AT 3.38 BPM, WITH 146 BBLS WATER. |
Total fluid used in treatment (bbls): | 196 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 146 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |